Retention of 2 no. Existing detached single storey self-service laundry kiosks as constructed along with retention of associated signage and logos on existing kiosks and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Surface level car park/plaza located between the apex business centre and the arcs building, beacon south quarter, Sandyford, Dublin 18
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 8,801 nearby planning records within 5 km where a location match is available.
- Matched source
- D25A/0159/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the change of use from existing vacant retail units (B2-R4 146sqm & B2-R5 142sqm) to indoor sports centre with ancillary retail use. The proposal comprises the amalgamation of the two retail units totalling 303sqm to provide 3no. golf simulation areas, reception area with associated coffee dock and retail area, Putting green/mobility/stretch area, 4 no. WCs and signage to the existing main entrance, together with all associated site development works. The development will be served by existing car and bicycle parking provision in the area.
Retention permission for internally mounted 5.0m x 4.0m digital advertising display screen to 1st floor glazed access stairwell fronting north west side elevation of Apex Business Centre.
Permission for development. The proposed development will substiantially comple
Provision of a drop-off/pick-up facility at this c.0.09 ha site for Beacon Hospital, currently occupying the existing facility adjacent to the site. The development will include a vehicular lay-by with 1 no. vehicular entry point, and 1 no. vehicular exit point, utilizing the existing junctions into Blackthorn Road; 5 no. drop-off/pick-up car parking spaces at surface level (including 2 no. accessible spaces); external pedestrian stairs, accessible ramp, and footpaths; 2 no. seating shelters; 1 no. totem signage; hard and soft landscaping; boundary treatments; changes in levels; street signage; site lighting; piped infrastructure and ducting; and all ancillary site excavation and development works above and below ground.
Permission for change to the opening hours from the current time of 10am
The full report covers all 8,801 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report