The development will consist of: a) the demolition of existing single storey monopitch glazed restaurant conservatory and smoking extension (38 m2) to front (north-west) of existing ground floor restaurant facing Ballymoss Road and replacement with construction of a larger (42 m2) single storey, monopitch glazed restaurant conservatory and smoking area extension to front (north-west) of building. b) Relocation of existing self-illuminating wall mounted entrance sign in existing smoking area to corner of proposed front (north-west) elevation of new conservatory. c) All associated site works and drainage. All of the above at the existing 11 storey apartment building (including basement) known as The Forum.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
China Sichuan, The Forum, Ballymoss Road, Sandyford Business Park, Dublin 18, D18XH28
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 8,988 nearby planning records within 5 km where a location match is available.
- Matched source
- D25A/0248/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development consists of the retention of an external ventilation duct installed following the works undertaken as part of the previously granted permission D23A/0780.
Change of use from cafe to cafe with takeaway provision and associated internal modifications.
Permission for: Installation on the southern (side) facade
Permission for development. The development will consist of: 1) the demolition of an existing two-storey warehouse/office building on the site (approximately 1,016 sq.m. GFA); 2) the construction of an up to nine storey aparthotel (approximately 7,424 sq. m GFA) consisting of 124 no. suites (75 no. one bedroom and 49 no. two bedroom) with associated ancillary support facilities at ground floor including café (83 sq. m. GFA), gymnasium (25 sq. m. GFA), multi-purpose room (26 sq. m. GFA), administration and back of house facilities over a single level basement providing 37 no. car parking spaces (including 2 no. disabled spaces), 36 no. cycle parking spaces, service and plant areas, waste management areas and storage areas; and 3) all other site development works required to facilitate the development including the formation of an additional vehicle access onto Ballymoss Road and set down area in front of the building. ESB substation and switch room, 14 no. surface cycle parking spaces, installation of PV panels on the roof, hard and soft landscaping, landscaped roof terraces on fifth and eighth floor level and public realm upgrades to Ballymoss Road including additional tree planting and crossings over the existing footpath.
Permission is sought for:- the construction of a development consisting of the
The full report covers all 8,988 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report