Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Frascati Centre, Frascati Road, Blackrock, Dublin, A94H720

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 9,305 nearby planning records within 5 km where a location match is available.

Matched source
D25A/0345/WEB
Project type
One-off house
Coverage
5 km radius
9,305Nearby applications
11%Refused
8,240Conditional grants
122Refusal reasons

Top refusal reasons nearby

Residential Amenity33
Design23
Visual Amenity21
Other11
Zoning Contravention9

Nearest similar decisions

D25A/0345/WEB

The development will consist of the installation of a compact modular substation and ancillary site development works; to facilitate 4 no. shared electric vehicle charging units and 8 no. charging bays and ancillary site works within a partially reconfigured parking area.

Granted0.0 km17 June 2025
D23B/0198

Partial demolition of existing single storey extension to rear and construction of new single storey extension to rear and side, new window at first floor to side and including all associated site works to an existing two storey detached dwelling.

Granted0.1 km21 June 2023
D19A/0706

Permission. The proposed developments comprises the

Granted0.1 km30 January 2020
D19A/0707

Permission. The proposal is for a substation and associated switchroom

Granted0.1 km13 November 2019
D21A/0996

Full Permission. The proposal relate to a Phase 3

Granted0.1 km29 July 2022
D21A/1014

Full permission. The proposal relates to the removal

Granted0.1 km17 January 2022

The full report covers all 9,305 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required