Amendment to pre-existing planning approved plan - Planning Register Reference D25A/403/WEB. The original planning permission was to demolish the single storey extension at the rear of the existing house & for construction of a 2 storey extension to the rear, consisting of a ground floor flat roof extension & a pitched roof 1st floor extension, along with a new vehicular entrance & pavement dish and all associated works. The amendment application is to do all of the above but the size of the build will be smaller.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
66, Ballinteer Park, Ballinteer, Dublin 16
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 9,153 nearby planning records within 5 km where a location match is available.
- Matched source
- D25A/0403/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Demolish the single storey extension at the rear of the existing house & for construction of a 2 storey extension to the rear, consisting of a ground floor flat roof extension & a pitched roof 1st floor extension, along with a new vehicular entrance & pavement dish and all associated works.
Permission for alterations to existing dwelling, two-storey extension to the
Permission for alterations to existing dwelling, two-storey extension to the
Permission for the construction of a single storey garden room and store of
Permission for development. The development will consist of
The full report covers all 9,153 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €29 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report