Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

21, Bishops Gate, Kilternan, Dublin, D18V060

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

15% of nearby decided applications were refused. The preview found 3,334 nearby planning records within 5 km where a location match is available.

Matched source
D25B/0226/WEB
Project type
One-off house
Coverage
5 km radius
3,334Nearby applications
15%Refused
2,834Conditional grants
3Refusal reasons

Top refusal reasons nearby

Rural Housing Need1
Traffic Sightlines1
Visual Amenity1

Nearest similar decisions

D25B/0226/WEB

The development consists of the installation of 4 no. rooflights to the front and side pitches of the existing roof.

Granted0.0 km20 June 2025
D25A/0657/WEB

The proposed development comprises of amendments to operating hours at the existing Links Creche and Montessori from 7am to 6pm Monday to Friday as per Condition 4(c) of ABP30984621 (Strategic Housing Development which included the subject creche) to 7am to 6.30pm Monday to Friday.

Granted0.1 km13 October 2025
D25A/0827/WEB

28 no. residential units, comprising of 18 no. 2 storey terraced houses (5 no. 4-bed and 13 no. 3-bed) and 10 no. apartments (5 no. 1-bed apartments and, 5 no. 3-bed apartments units) in 3 storey duplex buildings; ancillary site development and landscape works, including boundary treatments, provision of communal and private open space, 59 no. cycle parking, 49 no. car parking, bin storage, and facilitating a pedestrian/cyclist link to Bishop’s Gate; demolition of the existing dwelling house and outbuildings on site (c. 266 sq. m. ); 1528 sq. m. public open space. Relocation of existing site entrance to provide vehicular, cycle and pedestrian site access via the Enniskerry Road to serve the proposed development.

Granted0.1 km19 December 2025
D18A/0137/E

Permission for 16 semi-detached 2 storey 3-bedroom 113.5m2 dwellings to the rear of an existing dwelling on a 0.545 hectare site, with ancillary services, roads, landscaping and associated works.

Refused0.1 km17 May 2024
D18A/0137

Permission for 16 semi-detached 2 storey 3-bedroom 113.5m2 dwellings to the rear

Granted0.1 km25 January 2019
ABP30984621

Permission for a Strategic Housing Development. The site is generally bounded to the north by the existing Bishop’s Gate housing development, the Enniskerry Road to the east, the site also wraps around the Golden Ball development site (currently under construction, permitted under Reg. Ref. D16A/0090 / ABP Ref. PL06D.246537, as amended) to the south-east of the site and the southern boundary is formed by a private laneway linking to the Enniskerry Road and to the south of that laneway lie lands known locally as ‘Suttons Fields’, to the west are undeveloped Objective B greenfield lands. The proposed residential development consists of 203no. residential units in a mix of houses and apartment buildings ranging from 2 to 3 storeys overall comprising of: 109no. own door 2 storey terraced houses, consisting of; 88no. 3 bed 5 person houses (House Types A(L), A(R), A1(L), A1(R), A2(L), A2(R), A-Corner (L), A-Corner (R), D (L), D (R) and E); 16no. 4 bed 6 person houses (House Type B (L) and B (R)); 5no. 4 bed 7 person houses (House Types C (L), C (R) and F). 94no. apartment units accommodated in 4no. 3 storey buildings, consisting of; Block 1 accommodating 24no. units (21no. 2 bed and 3no. 3 bed units); Block 2 accommodating 24no. units (21no. 2 bed and 3no. 3 bed units); Block 3 accommodating 24no. units (21no. 2 bed and 3no. 3 bed units); Block 4 accommodating 22no. units (4no. 1 bed and 18no. 2 bed units). 1no. childcare facility (c. 380 sq m) and associated c.105 sq m amenity space is also proposed. All associated and ancillary site development and infrastructural works, hard and soft landscaping and boundary treatment works, including; Public open space (c. 5,760 sq m); Private communal amenity open space (c. 784 sq m); Provision of internal road network, including new road carriageways, pedestrian and cycle facilities, public lighting and street lighting; Vehicular Access serving the proposed development is primarily via the existing access road off Enniskerry Road serving the Bishop’s Gate development; Provision of two no. new connections to the adjacent ‘Golden Ball’ development site, which in turn also connects to a separate new junction on the Enniskerry Road (currently under construction, permitted under Reg. Ref. D16A/0090 / ABP Ref. PL06D.246537, as amended), catering for pedestrian/cyclist movement only and pedestrian/cyclist/vehicle movements respectively between the two sites; 335no. car parking spaces (9no. childcare facility spaces, 218no. house spaces, 94no. apartment spaces and 14no. visitor car parking spaces); 354no. cycle parking spaces. The application contains a statement setting out how the proposal is consistent with the objectives of the Dun Laoghaire-Rathdown County Council County Development Plan 2016–2022 and the Kiltiernan – Glenamuck Local Area Plan 2013 (extended to 2023). The application also contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.enniskerryroadshd.com

Granted0.1 km15 July 2021

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required