The construction of a new dormer on the rear roof slope, the installation of rooflights on the front roof slope, and minor internal alterations to the existing dwelling.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
98, Grianan Fidh, Aiken's Village, Stepaside, Dublin 18, D18RX25
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 6,792 nearby planning records within 5 km where a location match is available.
- Matched source
- D25B/0275/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for: A. Existing single storey flat roof extension to rear altered to
Permission for revision to previously granted one storey extension to the side and rear of the existing house (planning ref D23B/0337) to include a new 6 sqm one storey ground floor study located to the side. In addition, Retention permission to retain 4 solar panels fixed to the first and second floor balconies, located at the front of the house.
Permission. The development will consist of:
Permission for a rear first floor bedroom extension over rear dining and garden room extension including all associated ancillary works.
Permission is sought for conversion of existing attic space
The full report covers all 6,792 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report