The development will consist of the construction of a single-storey extension to the front, a single storey extension to the rear, and a rear dormer roof extension, with all associated and ancillary site works, including removal of existing single storey garden shed.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
268, Pearse Avenue, Thomastown, Sallynoggin, Co. Dublin, A96 X954
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 7,161 nearby planning records within 5 km where a location match is available.
- Matched source
- D25B/0422/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Permission for the development of a single-storey front extension, addition
The retention of the removal of the original chimney structure at roof ridge level and associated internal walls at ground and first floor including part rear wall. A two storey/part single storey extension to the rear elevation, Comprising new family kitchen/dining/utility/wc, A new sitting room window and single storey ground floor porch extension to the front elevation and a new door and windows to side elevation all at ground floor level. At first floor level a new bedroom and ensuite to the rear elevation, bay window projection to the side elevation for new bedroom layout. In addition to an attic conversion with roof Dormer to the rear elevation for a new second floor bedroom, Including internal alterations and all associated site works at 299 Pearse Avenue, Sallynoggin, County Dublin, A96 FP21
Permission for a single storey extension to the existing family/living room to
Permission for the conversion of the attic to a Playroom with dormer type flat
Permission for: A. Demolition of ground floor extension to rear of house. B.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report