Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 4,658 nearby planning records within 5 km where a location match is available.
- Matched source
- DZ18A/1131
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the subdivision and Change of Use of part of the ground floor
Permission for the development of a Loading Bay and ancillary services. The proposed development is located within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The development will consist of the construction of a new Loading Bay measuring 21.0m x 3.3m together with ancillary services, road markings and signage within a total area of development of 0.1619ha. The proposed development includes minor modifications to previously approved services and landscaping as granted under planning Register Reference DZ17A/0862.
Permission fora new office development comprising 4-storey office building with
Permission for development. The developemtn will consist of
The proposed development will provide for a science and technology-based office building of 4 storeys over basement with a gross floor area of 5,818 sqm. The building will be comprised of office and research & development laboratory accommodation on ground to third floor, with basement-level accommodating 27 No. Car parking spaces, 34 No. bicycle parking spaces and associated welfare facilities, storage, plant; E.S.B. substation at ground floor, semi-enclosed plant at first floor, roof plant and elevated link-bridge connection at second floor level to existing third floor level of Building 11 and associated alterations to the façade of Building 11. The external roof plant will accommodate air handling and heat pump technology behind louvred screen and laboratory exhaust flues. The proposed development will include, green roof, hard and soft landscaping, vehicular set-down area, boundary treatment works, 30 No. Surface bicycle parking spaces, lighting, attenuation and drainage works (including amendment of permitted attenuation pond granted under Reg. Ref. DZ22A/0681), and all ancillary site development works including the realignment of the existing access road, works to public road including removal of car parking space. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended).
The full report covers all 4,658 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record DZ18A/1131The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report