Permission for a mixed use development. The site located in the Cherrywood Planning Scheme area and forms part of the south eastern portion of the block Town Centre 3 (TC3). The site is bound by the Luas green line to the east (adjacent the Bride`s Glen terminus), Grand Parade to the east, Cherrywood Avenue to the south and west, and the R118 road (Wyattville Link Road) to the north. The development will consist of the following:- Construction of a mixed-use development ranging in height from 2 no. storeys to 8 no storeys from street/podium level over two basement levels. The overall development comprises 12,705 sqm residential, 12,151 sqm office (High Intensity Employment) and 1,431 sqm café restaurant (non retail) uses of development with an overall total, including ancillary spaces of 32,666 sqm. - Provision of an office building (High Intensity Employment) of 12,151 sqm up to 8 no. storeys in height to the south east corner of the site (Block TC3-1) including restaurant/café (non retail) uses comprising 1,353 sqm at ground/street level. - Provision of 198 no. Built-To-Rent apartments units in two blocks ranging in height from 2 to 5 storeys over basement; comprising of 31 studios, 55 no. 1 bedroom units and 112 no. 2 bedroom units with associated balconies and terraces. - Provision of café/restaurant (non retail) unit (78 sqm) at ground floor level of the residential Block TC3-8 fronting the central diagonal public space through the TC3 site; - The proposed development will also include the provision of communal and private open space include courtyard areas, terraces and balconies and roof terraces and the provision of tenant shared services, facilities and amenity space (1,606 sqm); - Provision of public open space including public plaza areas, footpaths, parking, loading bays, landscaping works and boundary treatments; - Provisions of two vehicular access points to basement level (below podium) from Cherrywood Avenue; - Parking at basement level (below podium) for 201 no. residential car parking spaces, 180 no. commercial car parking spaces. 640 no. bicycle spaces are proposed at basement and ground/street level (podium level); - The proposed development includes, SUDs drainage, the provision of green roofs throughout and all associated site development works and services and plant. - The proposed residential development is a `Build-to-Rent`scheme in accordance with Specific Planning policy 7 and 8 as set out in the `Sustainable Urban Housing: Design Standards for New Apartments - Guidelines for Planning Authorities (2018)`. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended).
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 4,735 nearby planning records within 5 km where a location match is available.
- Matched source
- DZ20A/0052
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for a mixed use development on lands.
Amendments to the permitted basement area within Development Area TC3 as permitted under Reg Ref. DZ21A/0785 on lands comprising of c.0.95ha in the townland of Cherrywood Dublin 18 (also Co. Dublin). The site is bound by the luas green line to the east (adjacent the Brides Glen Terminus). Grand Parade to the east, Cherrywood Avenue to the south and west and the R118 road (Wyattville Link Road) to the north. The proposed consists of the alteration of part of the basement level layout to facilitate future connection with the wider TC3 basement. The proposed amendment also includes interim traffic Management arrangements at basement level until the wider basement is delivered, in the scenario where the subject development is delivered first. the parking quantam and floor area remains unchanged. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended).
Permission for a mixed-use development on lands comprising of c. 3.71 ha in the townland of Cherrywood, Dublin 18 (also Co. Dublin). The site is located in the Cherrywood Planning Scheme area and forms part of the block Town Centre 3 (TC3). The site is bound by the Luas green line to the east (adjacent to Brides Glen Terminus). Grand Parade to the east, Cherrywood Avenue to the south and west, and the R118 road (Wyattville link road) to the north. The development will consist of the following: Construction of a mixed-use development ranging in height from 2no. storeys to 5 no. storeys from street/podium level over 1 no. basement level. The overall development comprises 33,557 sq.m residential 1597 sq.m cafe/restaurant/services (non-retail) uses of development, 821 sq.m community uses and 427 sq.m retail uses with an overall total 36,402 sq.m excluding basement. Provision of 418 no. Build-To-Rent apartments units in four blocks ranging in height from 2 to 5 storeys over basement, comprising of 124 studios, 96 no 1 bedroom units, 81 no. 2 bedroom (3 Person) units and 117 no. 2 bedroom (4 person) units with associated balconies and terraces. Provision of a ground/street level retail, community and non-retail units. The proposed development will also include the provision of communal and private open space including courtyard areas, terraces and balconies and roof terrace (only one) and the provision of tenant shared services, facilities and amenity space. Provision of public open space including public plaza areas, footpaths, parking, loading bays, landscaping works and boundary treatments. Provision of two vehicular access points to basement level (below podium) from Cherrywood Avenue. Parking at basement level (below podium) for 398 no. car parking spaces to service the residential childcare facility and other uses. The proposed development includes SUDs drainage, works to Cherrywood Avenue, the provision of green roofs throughout and all associated site development works and services and plant. The proposed residential development is a Build-to-Rent scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments - Guidelines for Planning Authorities (2020)' This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended) An environmental Impact Assessment Report has been prepared and will be submitted to the Planning Authority with the planning application.
SSC Property ICAV acting for and on behalf of SSC Property Fund 1 intend to apply for permission for development at ‘Red Zone’ temporary surface car park and Blocks F1-F3, ‘The Campus’ (Block F1-F3 basement car park) Cherrywood Avenue, Cherrywood (Glebe Townland), Co. Dublin (also Dublin 18). This application includes development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, As Amended. The proposed development will consist of: (1) Reduction in temporary car park (c.740 spaces) approved under Ref: DZ22A/0728) and reconfiguration of car parking layout, access arrangements and surface water arrangements on Plot HIE3 (a.k.a. BG5) to correspond with permitted residential development (Ref: DZ22A/1025) on Res2 plot (a.k.a. BG4) and the continued use of the residual temporary surface car park (up to c.398 parking spaces) with bus set down and motorcycle parking areas and associated works for a further 5 years. (2) the reallocation and use of up to 226no. (of total 655no.) existing “HIE” car parking spaces in the existing basement car park of Blocks F1-F3 at ‘The Campus’ as “Cumulative Temporary Car Parking” and associated amendment of Condition 10 of Ref: DZ17A/0122 and Condition 13 of Ref. DZ18A/1104 which stated that these spaces cannot be brought into operation prior to the future HIE blocks being permitted and commenced.
Permission for the following, The development will consist of the following: All site clearance and enabling works required to implement the development, including removal of existing car parking and hardstanding within application site boundary. Construction of a residential development of 44 no. units, comprising 8 no. four bedroom houses and 18 no. duplex buildings, containing 24 no. three bedroom units and 12 no. two bedroom units. The overall gross floor area of the residential development is 4,875 sqm. The proposed development will also include the provision of communal and private open space including gardens, terraces and balconies. Provision of landscaped open space (365 sqm) footpaths (including maintaining and upgrading an existing pedestrian link between Glencarraig and Cherrywood Avenue) landscaping works and boundary treatments. Provision of vehicular access arrangements from Cherrywood Avenue and internal access arrangements within the site. Provision of car parking (64 no. spaces) bicycle parking (53 no. spaces), and motorcycle parking (2 no. spaces). The proposed development includes drainage and services, works to Cherrywood Avenue including services connections, lighting, bin storage, a substation and all associated and ancillary site development works and services. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended).
The full report covers all 4,735 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record DZ20A/0052The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report