This application includes development within the Cherrywood
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18)
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 4,676 nearby planning records within 5 km where a location match is available.
- Matched source
- DZ20A/0477
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the following, The development will consist of the following: All site clearance and enabling works required to implement the development, including removal of existing car parking and hardstanding within application site boundary. Construction of a residential development of 44 no. units, comprising 8 no. four bedroom houses and 18 no. duplex buildings, containing 24 no. three bedroom units and 12 no. two bedroom units. The overall gross floor area of the residential development is 4,875 sqm. The proposed development will also include the provision of communal and private open space including gardens, terraces and balconies. Provision of landscaped open space (365 sqm) footpaths (including maintaining and upgrading an existing pedestrian link between Glencarraig and Cherrywood Avenue) landscaping works and boundary treatments. Provision of vehicular access arrangements from Cherrywood Avenue and internal access arrangements within the site. Provision of car parking (64 no. spaces) bicycle parking (53 no. spaces), and motorcycle parking (2 no. spaces). The proposed development includes drainage and services, works to Cherrywood Avenue including services connections, lighting, bin storage, a substation and all associated and ancillary site development works and services. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended).
The proposed development will provide for a science and technology-based office building of 4 storeys over basement with a gross floor area of 5,818 sqm. The building will be comprised of office and research & development laboratory accommodation on ground to third floor, with basement-level accommodating 27 No. Car parking spaces, 34 No. bicycle parking spaces and associated welfare facilities, storage, plant; E.S.B. substation at ground floor, semi-enclosed plant at first floor, roof plant and elevated link-bridge connection at second floor level to existing third floor level of Building 11 and associated alterations to the façade of Building 11. The external roof plant will accommodate air handling and heat pump technology behind louvred screen and laboratory exhaust flues. The proposed development will include, green roof, hard and soft landscaping, vehicular set-down area, boundary treatment works, 30 No. Surface bicycle parking spaces, lighting, attenuation and drainage works (including amendment of permitted attenuation pond granted under Reg. Ref. DZ22A/0681), and all ancillary site development works including the realignment of the existing access road, works to public road including removal of car parking space. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended).
Permission fora new office development comprising 4-storey office building with
This application relates to development within the Cherrywood
Permission for development at this site. The Development will consist of works within a total application area of 1.048Ha to include the construction of a five storey over ground residential apartment development on a site of 1.02Ha and inclusion of an additional area of 0.028Ha to facilitate site access via Cherrywood Avenue. The Development will comprise: i. 70 no. apartments (34 no. 1-bed apartments, 27 no. 2-bedroom apartments, and 9 no. 3-bedroom apartments). ii. Shared resident support facilities and tenant amenity (total approx. 190m2) comprising a communal lounge, communal workshop, concierge and post room at ground level, and communal amenity space (total approx. 124 m2) in the form of 8 no. winter gardens at the upper levels, and communal open space ( total approx. 2749m2). iii 71 no. car parking spaces (including 4 no. disabled spaces) and 72 no. long stay cycle parking spaces at under-croft level and 6 no. visitor car parking spaces at street level (accessed via Cherrywood Avenue) and 16 no. visitor cycle parking spaces at street level. iv. Creation of 2 no. pedestrian accesses, modifications/improvements to the existing footpath, and works to Cherrywood Avenue to facilitate vehicular access to the site. v. Hard and soft landscaping, boundary treatments, green roof, on-site lighting, ESB substation, plant room, SuDs drainage, piped and other services, and all ancillary site development works necessary to facilitate the development (including the alteration of site levels and the development of the previously permitted pond 5A-1 granted under planning register reference DZ18A/0854). The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended).
The full report covers all 4,676 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €29 incl. VAT.
Source match
Matched from public planning record DZ20A/0477The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.