Permission for development. This application relates to
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 5,904 nearby planning records within 5 km where a location match is available.
- Matched source
- DZ21A/0806
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for a residential scheme of 322 no. units and a crèche facility in buildings ranging in height from 2 to 4 storeys set around 3 principal public amenity spaces. The residential units will comprise 242 no. apartments and 80 no. houses. The apartments will be accommodated in 8 no. 4-storey blocks (over part basement). The apartments will have associated private balconies/terraces. Block A will accommodate 50 no. units comprising 18 no. 1-bedroom and 32 no. 2-bedroom units. Block B will accommodate 32 no. units comprising 13 no. 1-bedroom, 12 no. 2-bedroom and 7 no. 3-bedroom units. Block C will accommodate 12 no. units comprising 6 no. 1-bedroom and 6 no. 2-bedroom units. Block D will accommodate 32 units comprising 2 no. studio units, 14 no. 1-bedroom and 16 no. 2-bedroom units. Block E will accommodate 32 no. units comprising 6 no. 1-bedroom and 26 no. 2-bedroom units. Block F will accommodate 20 no. units comprising 1 no. studio unit, 11 no. 1 bedroom and 8 no. 2-bedroom units Blocks G and H will each accommodate 32 no. units comprising 6 no. 1-bedroom and 26 no. 2-bedroom units. Block C will accommodate a crèche facility at ground floor level. The houses will consist of 41 no. 3-bedroom units and 39 no. 4 bedroom units, ranging in height from 2 to 3 storeys. The majority of the houses (76) will be in terraces of between 3 and 10 houses, with 2 pairs of semi-detached units. All houses will be provided with surface level car parking. Two separate basements are proposed which will accommodate 338 no. car parking spaces to serve the apartments and crèche, bicycle parking (242 spaces), refuse storage and plant. The development includes the following external road and drainage infrastructure previously permitted by the Planning Authority, which will provide access and services to the development: - A section of Grand Parade from the existing Tully Vale Road to the junction with Gun and Drum Hill Road; A section of Gun and Drum Hill Road from the junctions of Grand Parade to Tully Park Access Road; Tully Park Access Road; Attenuation pond in Lehaunstown Valley, east of Tully Vale apartments. The development will include new internal access roads, surface level car parking (174 spaces) and bicycle parking, landscaping and boundary treatments; part of the new landscaped Greenway connecting Tully Park and Lehanustown Valley and all associated site development works and services, Sustainable Urban Drainage Systems (SUDS) components will include green and blue roofs, detention basins, underground modular storage and swales.The application relates to a development in the Cherrywood S.D.Z.
Permission for a residential scheme of 322 no. units and a crèche facility
The proposed development will consist of significant modifications and changes to the permission granted under planning Reg. Ref. DZ17A/0714 as extended under Reg. Ref. DZ17A/0714/E and as modified under Reg. Ref. DZ21A/0806. The modifications relate to the permitted 4-storey Blocks A1, A2, B and E fronting to Grand Parade. The permitted blocks accommodate 100 no. apartments comprising 32 no. 1-bedroom, 59 no. 2-bedroom and 9 no. 3-bedroom units and a creche. The proposed blocks will accommodate 158 no. apartments (a net increase of 58) comprising 49 no. 1-bedroom, 97 no. 2-bedroom and 12 no. 3-bedroom units and a creche. The development will consist of: Construction of new Block A, a 6-storey building to accommodate 62 no. apartments comprising 21 no. 1-bedroom and 41 no. 2-bedroom units and creche. The new Block A will be developed in lieu of the permitted 4-storey Blocks A1 & A2; Upward extension of 4-storey Block B to 6 storeys to accommodate 48 no. apartments comprising 20 no. 1-bedroom, 16 no. 2-bedroom and 12 no. 3-bedroom units; Upward extension of 4-storey Block E to 6 storeys to accommodate 48 no. apartments comprising 8 no. 1-bedroom and 40 no. 2-bedroom units; Reconfiguration and provision of 4 additional car parking spaces adjacent to Block A; Reconfiguration of the northern basement car park to provide 137 no. car parking spaces (a reduction of 5 spaces) and 208 no. cycle parking spaces (an increase of 78 spaces); Allocation of reduced car parking ratios to Blocks A, B and E; Landscaping and all associated site works and services.
Retention planning permission for a permanent retention of a single storey glass conservatory (22.4 sq.m.) to the rear of the existing residence, and all site works. This application relates to development within the Cherrywood Strategic Development Zone (SDZ).
Retention Planning Permission is sought for the Permanent Retention of a single storey steel and glass enclosure/conservatory to a portion of her rear garden (approx 23.60sq.m.) at the rear of her existing house for the enjoyment of the family with a use directly associated to the use of the Family Home as a residential unit, and all ancillary site works. This planning application relates to a development that is within the Cherrywood Strategic Development Zone (SDZ),
The full report covers all 5,904 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record DZ21A/0806The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report