Residential scheme of 934 dwelling units on an overall site of 9.7 hectares ( ABP- 320912-24).
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands at the former Central Mental Hospital, Dundrum Road, Dundrum, Dublin 14--ABP -320912-24.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 12,819 nearby planning records within 5 km where a location match is available.
- Matched source
- PC/2/2024
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
10 year permission for a Strategic Housing Development, with a total application site area of c.9.6 ha, on lands at the Central Mental Hospital, Dundrum Road, Dundrum, Dublin The subject site is in the immediate setting and curtilage of a number of proposed protected structures, namely the ‘Asylum’ (RPS No. 2072), the ‘Catholic Chapel’ (RPS No. 2071) and the ‘Hospital Building’ (RPS No. 2073). The development will consist of the demolition of existing structures associated with the existing use (3,736 sq m), including: Single storey former swimming pool / sports hall and admissions unit (2,750 sq m); Two storey redbrick building (305 sq m); Single storey ancillary and temporary structures including portacabins (677 sq m); Removal of existing internal sub-divisions/ fencing, including removal of security fence at Dundrum Road entrance; Demolition of section of porch and glazed screens at Gate Lodge building (4 sq m); Removal of walls adjacent to Main Hospital Building; Alterations and removal of section of wall to Walled Garden. The development will also consist of alterations and partial demolition of the perimeter wall, including: Alterations and removal of section of perimeter wall adjacent to Rosemount Green (south); Formation of a new opening in perimeter wall at Annaville Grove to provide a pedestrian and cyclist access; Alterations and removal of sections of wall adjacent to Dundrum Road (including removal of existing gates and entrance canopy), including reduction in height of section, widening of existing vehicular access, provision of a new vehicular, cyclist and pedestrian access; Alterations and removal of section of perimeter wall adjacent to Mulvey Park to provide a pedestrian and cyclist access. The development with a total gross floor area of c. 106,770 sq m (c. 106,692 sq m excluding retained existing buildings), will consist of 977 no. residential units comprising: 940 no. apartments (consisting of 53 no. studio units; 423 no. one bedroom units; 37 no. two bedroom (3 person) units; 317 no. two bedroom (4 person) units; and 110 no. three bedroom units) arranged in 9 blocks (Blocks 02-10) ranging between 2 and 6 storeys in height (with a lower ground floor to Block 03 and Block 10, resulting in part 7 storey), together with private (balconies and private terraces) and communal amenity open space provision (including courtyards and roof gardens) and ancillary residential facilities; 17 no. duplex apartments (consisting of 3 no. two bedroom units and 14 no. three bedrooms units located at Blocks 02, 08 and 09), together with private balconies and terraces. 20 no. two and three storey houses (consisting of 7 no. three bedroom units and 13 no. four bedroom units) and private rear gardens located at Blocks 02, 08 and 09). The development will also consist of 3,889 sq m of non-residential uses, comprising: Change of use and renovation of existing single storey Gate Lodge building (reception/staff area) to provide a café unit (78 sq m); 1 no restaurant unit (307 sq m) located at ground floor level at Block 03; 6 no. retail units (1,112 sq m) located at ground floor level at Blocks 03 and 07; 1 no. medical unit (245 sq m) located at ground floor level at Block 02; A new childcare facility (463 sq m) and associated outdoor play area located at ground floor level at Block 10; and A new community centre facility, including a multi-purpose hall, changing rooms, meeting rooms, storage and associated facilities (1,684 sq m) located at ground and first floor level at Block 06. Vehicular access to the site will be from the existing access off Dundrum Road, as revised, and from a new access also off Dundrum Road to the south of the existing access. The development will also consist of the provision of public open space and related play areas; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, wetland feature, part-basement, car parking (547 no. spaces in total, including car sharing and accessible spaces); motorcycle parking; electric vehicle charging points; bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections (including connection into existing surface water sewer in St. Columbanus Road); ducting; plant (including external plant for district heating and pumping station); waste management provision; SuDS measures (including green roofs); attenuation tanks; sustainability measures (including solar panels); signage; public lighting; any making good works to perimeter wall and all site development and excavation works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire Rathdown County Development Plan 2016-2022 and the Dún Laoghaire Rathdown Development Plan 2022-2028. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act 2000, as amended, notwithstanding that the proposed development materially contravenes the Dún Laoghaire Rathdown County Development Plan 2016-2022 and the Dún Laoghaire Rathdown Development Plan 2022-2028 other than in relation to the zoning of the land. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development. The application, together with the Environmental Impact Assessment Report and Natura Impact Statement, may be inspected, or purchased, at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the Applicant: - www.dundrumcentralresidential.ie
Permission is sought for an extension to the existing two-storey hipped-roof semi-detached house on a corner site, including a new two-storey hipped-roof extension to the front and side, and a partial flat-roof two-storey rear extension, new roof over existing sun room, new Velux windows to the main roof, widening the front vehicular access, relocation of the side gate, some internal alterations, and associated site works
Permission is sought for 2 storey front extension, extension to the side over existing converted garage, which will wrap around the back on both levels to connect with existing sunroom, new roof over existing sunroom, new Velux windows to front side and rear of the existing roof, widening existing vehicular access gate, moving existing side access further down the rear of the garden, some internal alterations and associated site works.
Front single-storey extension, Two-storey extension to the side with gable to the front at roof level. Single-storey extension to the rear. Attic conversion for storage. With two dormers to the rear and a raised gable to the side. Roof window to the front roof area. Demolition of shed.
Permission is sought for extension & alteration works
Source match
Matched from public planning record PC/2/2024The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report