PlanIntelPlanning precedent preview

Planning precedent report

2 No. sites, measuring c. 14.2 Ha., which will be separated by the future Glenamuck Link Distributor Road (GLDR), Kilternan, Co. Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

16% of nearby decided applications were refused. The preview found 3,172 nearby planning records within 5 km where a location match is available.

Matched source
LRD24A/0597
Project type
One-off house
Coverage
5 km radius
3,172Nearby applications
16%Refused
2,656Conditional grants
4Refusal reasons

Top refusal reasons nearby

Traffic Sightlines2
Rural Housing Need1
Visual Amenity1

Nearest similar decisions

LRD24A/0597

For a Large-Scale Residential Development on 2 No. sites, measuring c. 14.2 Ha.,which will be separated by the future Glenamuck Link Distributor Road (GLDR). The western site principally comprises lands at Wayside Enniskerry Road and Glenamuck Road, Kilternan, Dublin 18, which include a derelict dwelling known as ‘Rockville’ and associated derelict outbuildings, Enniskerry Road, Kilternan, Dublin 18, D18 Y199 and the former Kilternan Country Market, Enniskerry Road, Kilternan, Dublin 18 D18 PK09. The western site is generally bounded by the Glenamuck Road to the north; the Sancta Maria property to the north, west and south; a residential development named “Rockville” to the north-east; the Enniskerry Road to the South-west; dwellings to the south; and future GLDR to the east. The eastern site is generally bound by dwellings to the south; the future GLDR to the west; and greenfield land to the north and east. Road works are proposed to facilitate access to the development from the Enniskerry Road; to the approved Part 8 Enniskerry Road/Glenamuck Road Junction Upgrade Scheme on Glenamuck Road (DLRCC Part 8 Ref. PC/IC/01/17); and to the approved Glenamuck District Road Scheme (GDRS) (ABP Ref. HA06D.303945) on the Glenamuck Link Distributor Road (GLDR). Drainage and potable water infrastructure is proposed to connect to services on the Glenamuck Road, Enniskerry Road and the GLDR. The Glenamuck Road access point will include works, inclusive of any necessary tie- ins, to the footpath and cycle tracks to create a side road access junction incorporating the provision of an uncontrolled pedestrian crossing across the side road junction on a raised table and the changing of the cycle track to a cycle lane at road level as the cycle facility passes the side road junction. Surface water and foul drainage infrastructure is proposed to connect into the drainage infrastructure to be constructed as part of the Part 8 scheme. Potable water is to be provided from the existing piped infrastructure adjacent to the site along Glenamuck Road. Surface water and foul drainage infrastructure connections for the ‘former Country Market’ area (north-west of the site) are proposed to connect into the drainage infrastructure at the Enniskerry Road/ Glenamuck Road junction. The GLDR ‘western’ access point will include works, inclusive of any necessary tie- ins, to the footpath and cycle track to create a side road access junction incorporating the provision of short section of shared path and an uncontrolled shared pedestrian and cyclist crossing across the side road junction on a raised table. The works will also include the provision of a toucan crossing, inclusive of the necessary traffic signal equipment, immediately south of the access point to facilitate pedestrian and cyclist movement across the mainline road. All works at this GLDR access point will include the provision of the necessary tactile paving layouts. Surface water, foul drainage and potable water infrastructure connections are proposed into the drainage infrastructure to be constructed and part of the GDRS scheme. The GLDR ‘eastern’ access point will include works, inclusive of any necessary tie- ins, to the footpath and cycle track to create a side road access junction incorporating the provision of short section of shared path and an uncontrolled shared pedestrian and cyclist crossing across the side road junction on a raised table. Potable water, surface water and foul drainage infrastructure connections for the eastern site are proposed into the drainage infrastructure to be constructed as part of the GLDR. On Enniskerry Road, works are proposed to facilitate 3 No. new accesses for the development along with modifications to Enniskerry Road. The 3 No. side road priority access junctions incorporate the provision of an uncontrolled pedestrian crossing across the side road junction on raise tables. The modifications to Enniskerry Road fronting the development (c. 340 metres) includes the narrowing of the carriageway down to c.6.5 metres (i.e. a c.3.25 metres running lane in each direction) from the front of the kerb on the western side of Enniskerry Road. The remaining former carriageway, which varies in width of c. 2 metres, will be reallocated for other road users and will include the introduction of a widened pedestrian footpath and landscaped buffer on the easter side of the road adjoining the proposed development. On Enniskerry Road at the interface of the proposed Dingle Way and Enniskerry Road, aligning with the proposed location of the community centre/ Café and existing Our Lady of Wayside Church, works include the continuation of the Dingle Way surface materials across Enniskerry Road to create a raised table to connect these community facilities. The above works are inclusive of all necessary tie-in works such as new kerbs along the eastern side of Enniskerry Road, drainage details, road marking, signage and public lighting. Additionally, the development included the removal of the existing stone wall and the construction of a new stone wall set back to facilitate the upgrade and realignment of the Enniskerry Road. Potable water is to be provided from the existing piped infrastructure along the Enniskerry Road. At the ‘Rockville access point’, works are proposed to provide a multi-modal access, including a vehicular connection between the proposed development and the Rockville development (permitted under DLR Reg. Ref. D18A/0566). The new access will require the removal of the existing as-built hammerhead turning area at Rockville to create this new connection. The residual hammerhead area will be landscaped to tie into the adjoining landscape strategy. The above works are inclusive of all necessary tie-in works such as new kerbs, drainage details, road marking, signage and public lighting. Surface water and foul drainage infrastructure is proposed to connect into and through the existing/permitted Rockville developments (DLR Reg Refs D17A/0793, D18A/0566, D20A/0015 and D23A/0580). The development will principally consist of: the demolition of c.740 sq m of existing structures on site comprising a derelict dwelling known as ‘Rockville’ and associated derelict outbuildings (c. 573 sq m) and the former Kilternan Country Market (wooden structure) (c.167 sq m); and the provision of a mixed-use development principally consisting of 487 No. residential units (196 No. houses, 201 No. duplex units and 90 No. apartments) and a Neighbourhood Centre. The western site will comprise 362 No. residential units and the Neighbourhood Centre, which will provide and anchor retail store (c. 1,3,10 sq m) retail/commercial (c. 3,284 sq m), a restaurant (c. 182 sq m), a creche (c. 691 sq m) café (c. 326 sq m), and a community facility (c.332 sq m ), and the eastern site will comprise 125 No. residential units. The 487 No. residential units will consist of 53 No. 1 bedroom units (35 No. apartments and 18 No. duplexes), 150 No. 2 bedroom units 38 No. houses, 16 No. apartments and 96 No. duplexes), 236 No. 3 bedroom units (110 No houses, 39 No apartments and 87 No. duplexes) and 48 No. 4 bedroom units (48 No. houses). The proposed development will range in height from 2 No. to 4 No. storeys (partially over podium/undercroft level in Apartment Blocks 1, 2 and 3 and Duplex Block T and U on the eastern site). The development also provides: a pedestrian/cycle route through the Dingle Way from Enniskerry Road to the future Glenamuck Link Distributor Road; 854 No. car parking spaces (125 No. in the undercroft of Apartment Blocks 1,2, and 3 and Duplex Blocks T and U and 729 No. at surface level) including 28 No. mobility impaired spaces, 100 No. electric vehicle spaces, 2 No. car share spaces, and 4 No. drop-off spaces/loading bays; motorcycle parking; bicycle parking; bin storage; provision of new telecommunications infrastructure at roof level of the Neighbourhood Centre including shrouds, antennas and microwave link dishes (18 No. antennas all enclosed in 9 No. shrouds and 6 No. transmission dishes, together with all associated equipment); private balconies, terraces and gardens; hard and soft landscaping; totem pole, sedum roofs, solar panels, boundary treatments, lighting; substations; plant; and all other associated site works above and below grounds. The proposed development has a gross floor area of c. 60,504 sq m above ground, in addition to an undercroft/basement (c.4,485 sq m) containing car parking, bike storage, bin storage and plant under Apartment Blocks 1, 2, and 3 and Duplex Blocks T and U on the eastern site. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The Planning application together with the Environmental Impact Assessment Report may be inspected or purchased for a fee not exceeding a reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. The application and Environmental Impact Assessment Report may also be inspected online at the following website set up by the applicant: www.kilternanvillagelrd.ie

Granted0.0 km07 March 2025
ABP31386022

Permission for a strategic housing development. Road works are also proposed to facilitate access to the development from the Enniskerry Road; to the approved Part 8 Enniskerry Road/Glenamuck Road Junction Upgrade Scheme on Glenamuck Road (DLRCC Part 8 Ref PC/IC/01/17); and to the approved Glenamuck District Roads Scheme (GDRS) (ABP Ref:HA06D.303945) on the Glenamuck Link Distributor Road (GLDR). Drainage and water works are also proposed to connect to services on the Glenamuck Road and Enniskerry Road. At the Glenamuck Road access point, this will include works, inclusive of any necessary tie-ins, to the footpath and cycle track to create a side road access junction incorporating the provision of an uncontrolled pedestrian crossing across the side road junction on a raised table and the changing of the cycle track to a cycle lane at road level as the cycle facility passes the side road junction. Surface water and foul drainage infrastructure is proposed towards the north of the site into the drainage infrastructure to be constructed as part of the Part 8 scheme. Potable water is to be provided from the existing piped infrastructure adjacent to the site along Glenamuck Road. These interfacing works are proposed on an area measuring c. 0.05 Ha. At the GLDR access point, this will include works, inclusive of any necessary tie-ins, to the footpath and cycle track to create a side road access junction incorporating the provision of short section of shared path and an uncontrolled shared pedestrian and cyclist crossing across the side road junction on a raised table. The works will also include the provision of a toucan crossing, inclusive of the necessary traffic signal equipment, immediately south of the access point to facilitate pedestrian and cyclist movement across the mainline road. All works at the GLDR access point will include the provision of the necessary tactile paving layouts and are provided on an area measuring c. 0.06 Ha. At the Enniskerry Road, works are proposed to facilitate 3 No. new accesses for the development along with modifications to Enniskerry Road. The 3 No. side road priority access junctions incorporate the provision of an uncontrolled pedestrian crossing across the side road junction on a raised table. The modifications to Enniskerry Road fronting the development (circa 320 metres) includes the narrowing of the carriageway down to 6.5 metres (i.e. a 3.25 metres running lane in each direction) from the front of the kerb on western side of Enniskerry Road. The remaining former carriageway, which varies in width of c. 2 metres, will be reallocated for other road users and will include the introduction of a widened pedestrian footpath and landscaped buffer on the eastern side of the road adjoining the proposed development. The above works are inclusive of all necessary tie-in works such as new kerb along eastern side of Enniskerry Road, drainage details, road marking, signage and public lighting. Potable water is to be provided from the existing piped infrastructure adjacent to the site along the Enniskerry Road. The interface works on Enniskerry Road measures c. 0.19 Ha. Surface water and foul drainage infrastructure is proposed to connect into and through the existing/permitted Rockville developments (DLR Reg. Refs. D17A/0793, D18A/0566 and D20A/0015) on a total area measuring c. 0.09 ha. The development site area and drainage and roads works areas will provide a total application site area of c. 11.2 Ha. The development will principally consist of: the demolition of c. 573.2 sq m of existing structures on site comprising a derelict dwelling known as ‘Rockville’ and associated derelict outbuildings; and the provision of a mixed use development consisting of 383 No. residential units (165 No. houses, 118 No. duplex units and 100 No. apartments) and a Neighbourhood Centre, which will provide a creche (439 sq m), office (317 sq m), medical (147 sq m), retail (857 sq m), convenience retail (431 sq m) and a community facility (321 sq m). The 383 No. residential units will consist of 27 No. 1 bedroom units (19 No. apartments and 8 No. duplexes), 128 No. 2 bedroom units (78 No. apartments and 50 No. duplexes), 171 No. 3 bedroom units (108 No. houses, 3 No. apartments and 60 No. duplexes) and 57 No. 4 bedroom units (57 No. houses). The proposed development will range in height from 2 No. to 5 No. storeys (including podium/undercroft level in Apartment Blocks C and D and in the Neighbourhood Centre). The development also provides: pedestrian links from Enniskerry Road and within the site to the neighbouring ‘Rockville’ development to the north-east and a pedestrian/cycle route through the Dingle Way from Enniskerry Road to the future Glenamuck Link Distributor Road; 678 No. car parking spaces (110 No. in the undercroft of Blocks C and D and the Neighbourhood Centre and 568 No. at surface level) including 16 No. mobility impaired spaces, 73 No. electric vehicle spaces, 1 No. car share space, 4 No. drop-off spaces/loading bays; motorcycle parking; bicycle parking; bin storage; the decommissioning of the existing telecommunications mast at ground level and provision of new telecommunications infrastructure at roof level of the Neighbourhood Centre including shrouds, antennas and microwave link dishes (18 No. antennas and 6 No. transmission dishes, all enclosed in 9 No. shrouds together with all associated equipment); private balconies, terraces and gardens; hard and soft landscaping; sedum roofs; solar panels; boundary treatments; lighting; substations; plant; and all other associated site works above and below ground. The proposed development has a gross floor space of c. 43,120 sq m in addition to undercroft levels (under Apartment Blocks C and D measuring c. 1,347 sq m and under the Neighbourhood Centre measuring c. 2,183 sq m, which includes parking spaces, external storage, bin storage, bike storage and plant). The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2022-2028 and the Kilternan-Glenamuck Local Area Plan 2013 - 2019 [extended to 2023]. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application together with the Environmental Impact Assessment Report may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire-Rathdown County Council. The application and Environmental Impact Assessment Report may also be inspected online at the following website set up by the applicant: www.kilternanvillageshd.ie

Refused0.0 km27 July 2023
D23A/0616

Permission for development at a 3.9 Ha. site. The site is generally bounded by the Sancta Maria property to the north; greenfield land to the north-east with a recently constructed residential development named "Rockville" further to the north-east; the Enniskerry Road to the south-west; greenfield lands to the south with dwellings further south; and lands that will facilitate the future Glenamuck Link Distributor Road to the east. At the GLDR access point, this will include works, inclusive of any necessary tie-ins, to the footpath and cycle track to create a side road access junction incorporating the provision of short section of shared path and an uncontrolled shared pedestrian and cyclist crossing across the side road junction on a raised table. The works will also include the provision of a toucan crossing, inclusive of the necessary traffic signal equipment, immediately south of the access point to facilitate pedestrian and cyclist movement across the mainline road. All works at the GLDR access point will include the provision of the necessary tactile paving layouts and are provided on an area measuring c. 0.06 Ha. At the Enniskerry Road, works are proposed to facilitate 2 No. new accesses for the development along with modifications to Enniskerry Road. The 2 No. side road priority access junctions incorporate the provision of an uncontrolled pedestrian crossing across the side road junction on a raised table. The modifications to Enniskerry Road fronting the development (circa 340 metres) includes the narrowing of the carriageway down to 6.5 metres (i.e. a 3.25 metres running lane in each direction) from the front of the kerb on western side of Enniskerry Road. The remaining former carriageway, which varies in width of c. 2 metres, will be reallocated for other road users and will include the introduction of a widened pedestrian footpath and landscaped buffer on the eastern side of the road adjoining the proposed development. The above works are inclusive of all necessary tie-in works such as new kerb along eastern side of Enniskerry Road, drainage details, road marking, signage and public lighting. Potable water is to be provided from the existing piped infrastructure along the Enniskerry Road. The interface works on Enniskerry Road measures c. 0.28 Ha. Additionally, the development includes the removal of the existing stone wall and the construction of a new stone wall set back on the applicant’s lands to facilitate the upgrade and realignment of the Enniskerry Road. Surface water and foul drainage infrastructure is proposed to connect into and through the existing/permitted Rockville developments (DLR Reg. Refs. D17A/0793, D18A/0566 and D20A/0015) on a total area measuring c. 0.5 Ha. The development site area and drainage and roads works areas will provide a total application site area of c. 4.7 Ha. The development will principally consist of: the provision of a mixed use development consisting of 91 No. residential units (72 No. houses and 19 No. duplex units), a creche (405 sq m) and retail/commercial floorspace (356 sq m), which ranges in height from 2 to 4 No. storeys. The 91 No. residential units will consist of 5 No. 1 bedroom units (5 No. duplexes), 18 No. 2 bedroom units (9 No. duplexes and 9 No. houses), 48 No. 3 bedroom units (43 No. houses and 5 No. duplexes) and 20 No. 4 bedroom units (20 No. houses). The development also provides: pedestrian links from Enniskerry Road and a pedestrian route from Enniskerry Road to the future Glenamuck Link Distributor Road; 178 No. car parking spaces including 2 No. mobility impaired spaces, 10 No. electric vehicle spaces, 1 No. drop-off space/loading bay and 1 No. parent and child space; motorcycle parking; bicycle parking; bin storage; private balconies, terraces and gardens; hard and soft landscaping; sedum roofs; solar panels; boundary treatments; lighting; substation; plant; and all other associated site works above and below ground. The proposed development has a gross floor area of c. 12,120 sq m.

Granted0.1 km07 June 2024
D24B/0400/WEB

Planning Permission for construction of a double storey extension to side & rear, with first floor covered walkway & all associated site works.

Granted0.1 km04 November 2024
D18A/1191

Permission for change of house type for 5 previously approved house types

Granted0.2 km19 February 2019
D18A/0566

Permission for residential development. The proposal consists of the constr

Granted0.2 km02 October 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF