1 Unit
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
32, Laburnum Road, Clonskeagh, DUBLIN, D14FK12
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 13,626 nearby planning records within 5 km where a location match is available.
- Matched source
- V/034/26
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the demolition of existing car port and construction of new
The development will consist of: The change of use of the existing garage from its existing use as a garage/storage space to proposed use as a living room; the removal of the existing garage door and provision of a new window with brick infill to the former garage door opening, all finishes to match the existing dwelling; an increase in height of the existing garage parapet by 400mm; increase in width of existing vehicular entrance to 3.5m; hard and soft landscaping and all associated site development works above and below ground.
Permission is sought for demolition of existing conservatory and construction
Permission ofr development. Permission is sought for:
The demolition of the existing ground floor extension to the rear & construction of a new ground & 1st floor extension to the rear, raising of the side gable wall to allow for an attic conversion with 2 no. dormer windows to the rear, garage conversion with single storey flat roof extension to the front & widening of vehicular entrance to 3.5M.
The full report covers all 13,626 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record V/034/26The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report