Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Fingal House, Stephenstown Business Park, Stephenstown, Balbriggan, Co

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

23% of nearby decided applications were refused. The preview found 725 nearby planning records within 5 km where a location match is available.

Matched source
F18A/0010
Project type
One-off house
Coverage
5 km radius
725Nearby applications
23%Refused
561Conditional grants
9Refusal reasons

Top refusal reasons nearby

Design2
Visual Amenity2
Zoning Contravention2
Other1
Residential Amenity1

Nearest similar decisions

F18A/0010

Single storey extension to rear of existing industrial unit & the demo

Granted0.0 km06 March 2018
F20A/0108

Alterations to approved plans (Ref. No. F18A/0010). The alterations are the reduced floor area from 335m² to 163m² of a single storey extension to rear of existing industrial unit.

Granted0.0 km17 June 2020
F23A/0634

An Environmental Impact Assessment Report (EIAR) has been submitted with this application. Permission for development at the existing waste recovery facility located at Stephenstown Business Park, Stephenstown, Balbriggan, County Dublin, K32X996. The development will consist of: (i) An increase in the total annual waste intake to 95,500 tonnes per annum for recovery; (ii) Revision of operating hours to include public holidays; (iii) Ancillary works comprising a covered bicycle store (6 no. spaces) and reconfiguration of the existing car parking area (7 no. car spaces and 1 no. motorcycle space) to include an electric vehicle charging point and associated underground cable ducting. The development will comprise an activity requiring a review of the existing Industrial Emissions licence (EPA reference no. P1014-01). AI received 08/02/24

Granted0.1 km03 April 2024
F20A/0138

Demolition of existing detached garage (floor area 72 m2) and the construction of a single storey extension to the site of existing factory (floor area 482.50 m2).

Granted0.1 km07 July 2020
F17A/0376

Permission for internal alterations to existing building and construct

Granted0.1 km14 March 2018
F21A/0567

Permission to erect a 30m monopole type structure carrying communications antennae and dishes within a proposed 2.4m high palisade fenced and landscaped compound, along with associated ground-mounted equipment, to be shared with multiple operators. AI received 24/2/2022

Granted0.2 km22 March 2022

The full report covers all 725 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required