Single storey vehicle showroom extension (267 sq.m.) to rear of existi
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
McElvaney Motors Ltd., North Road, Finglas, Dublin 11.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 3,764 nearby planning records within 5 km where a location match is available.
- Matched source
- F18A/0015
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Planning permission for single storey service workshop extension (589 sq mts) to rear of existing service workshop building at their existing premises.
Single storey service workshop extension (322m²) to rear of existing service workshop building.
Permission for the installation of roof mounted solar photovoltaic panels to include all ancillary works and services. AI received 10/05/21
The erection of two illuminated totem signs approximately 6.5m high x
The proposed development will consist of 243no. residential units in 3no. Blocks (Blocks E, F and G) with a total gross floor area (GFA) of 22,116sq.m (excluding basement car parking) with associated ancillary accommodation, private balconies, communal amenity spaces and public open spaces as follows: Block E is an 8 storey building comprising 95no. apartments (24no. 1 bed units and 71no. 2 bed units; Block F is a 7 storey building comprising 81no. apartments (53no. 1 bed units and 28no. 2 bed units) and Block G is a 7 storey building comprising 67no. apartments (39no. 1 bed units and 28no. 2 bed units). A total of 108no. car parking spaces are provided in a combination of surface spaces and at basement level beneath Blocks E and F. The development will be accessed from Charlestown Place and via the adjoining Phase 1 development (Reg. Ref. ABP-310350-21) to the east which is currently under construction and modifications are proposed to the adjoining Phase 1 to provide for integration of Phases 1 and 2, including revised fire tender access for Phase 1 and basement access for Phase 2 west of the permitted Block C and east of the proposed Block E, access road and infrastructure connections between Phase 1 and 2 and bin store and bin staging point to the south east of the proposed Block G. The proposed Phase 2 development makes provision for access and infrastructure connections to the applicant's lands within the Dublin City Council administrative area to the west which will be subject of a separate future planning application. Permission is also sought for, hard and soft landscaping in public realm and public open spaces within the development, cycle parking at surface and basement levels, water supply and foul water connections and surface water infrastructure, connections to public utilities, ESB stations, plant areas, roof mounted photovoltaic (PV) panels and all associated site and development works. The application is a Large-Scale Residential Development and may be inspected at the following website: www.charlestownplacephase2lrd.com An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development.
Source match
Matched from public planning record F18A/0015The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report