Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Middle Pier, Howth Fishery Harbour Centre, Howth, Co Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

17% of nearby decided applications were refused. The preview found 1,109 nearby planning records within 5 km where a location match is available.

Matched source
F18A/0074
Project type
One-off house
Coverage
5 km radius
1,109Nearby applications
17%Refused
923Conditional grants
4Refusal reasons

Top refusal reasons nearby

Residential Amenity3
Visual Amenity1

Nearest similar decisions

F18A/0074

Permission for the provision of 130m long quay wall; associated deck a

Granted0.0 km10 July 2018
F19A/0296

Amend a previously permitted development F18A/0074

Granted0.0 km23 August 2019
F21A/0368

Proposed development works will consist of the following; (i) Dredging of the harbour. (ii) Stabilisation of dredge material. (iii) Reclamation of land on the west side of the West Pier using dredge material. (iv) Construction of an embarkment and rock armour revetment around the perimeter of the reclaimed area. (v) Landscaping of the reclaimed area and provision of pavements, including footways, roadways and parking areas. (vi) Construction of a slipway access to the water. (vii) Provision of storage areas for harbour activities; and (viii) Provision of services, including surface water drainage, mains water supply, lighting, and associated underground ducting. The proposed development consists of work to the West Pier at Howth FCC, a protected structure (RPS 0595b/NIAH 11359040)). The proposed development will require an Industrial Emissions (IE) licence or waste licence from the Environmental Protection Agency. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. AI received 2/6/2022 AI deemed significant ** Revised public notices received 13/6/2022

Granted0.1 km05 August 2022
F24A/0704E

AOC Dane Taverns Limited is applying for planning permission at No. 7 West Pier, Howth, Co. Dublin which is a Protected Structure. The development will consist of a change of use from a Boat House to a restaurant, retail unit and heritage exhibition space. External modifications of existing building to include (1) existing large doors to front elevation fixed in place and new pedestrian entrance doors added with glazed panels, (2) new windows and fire escape stairs to rear elevations. The interior fit-out includes (3) demolition of existing showers, storage and staff kitchenette, (4) new ground floor restaurant and kitchen, retail unit and heritage exhibition space, and (5) new mezzanine level restaurant and toilets. The development will include all associated site works and services. AI Received 21/03/2025

Granted0.1 km14 April 2025
F21A/0552

The development will consist of lowering existing front boundary wall replacing with decorative railing and provision of escape door and windows to west elevation.

Refused0.1 km02 December 2021
F26A/0045E

Planning permission is sought at No 5 West Pier, Howth Co. Dublin (a protected structure) by Shona Wright for material change of use at the Former Lifeboat House, from storage use to seafood processing use with ancillary dispatch, & café with eat-in seating. The proposed development works will include: Refurbishment of the fabric of the existing building, fitout of premises to accommodate food preparation and packaging & serving area, replacement of doors, relaying of existing floor to allow for servicing, restoration or repair works on the exterior of the building (as necessary); repair and replacement of doors, new signage and all associated site development works necessary to facilitate the proposed development. Additional Information received 23/04/26

Granted0.1 km20 May 2026

The full report covers all 1,109 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required