Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
30% of nearby decided applications were refused. The site check found 560 decisions within 5 km, 1 exact-site or onsite candidate record, and 61 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Fingal County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Fingal County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Fingal County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
61 structured nearby appeal records.
61 matchedCitations are current-dated and carry policy name, section, page and source URL from the Fingal County Council development plan.
2 matchedOpen preview
Open preview
Permission for (i) construction of 1 no. two storey 4 bedroom dwelling
The provision of an ancillary vehicle parking facility to provide acce
Install 26 solar panels (24 on house roof plus 2 garage roof) & solar
(i) demolition of existing two-storey, four-bedroom, detached dwelling with associated detached single-storey garage and demolition of all existing farm buildings inclusive of 3 no. two-storey sheds and 1 no. single-storey glasshouse; (ii) removal of existing vehicular entrance via R125 (iii) construction of a replacement two-storey four-bedroom detached dwelling, with attached single storey carport/storage area, and the construction of a two-storey outbuilding comprising garage, plant and store room on the ground floor level and gym and art room on the first floor level. The replacement dwelling and outbuilding will be served by a new vehicular entrance off R125 (iv) construction of a farm complex comprising 1 no. two-storey building (comprising workshop, office, canteen and storage uses at ground floor level, and a two-bedroom staff accommodation apartment at first floor level), 3 no. single-storey barns, horse walker, lunge pen and sand area. The farm complex will be accessible via an existing vehicular entrance off R125; (v) construction of 2 no. single-storey grain sheds accessed via the existing vehicular entrance off Ballaghaweary road; and (vi) the development will also include all associated works, inclusive of landscaping, planting, boundary treatments, lighting and foul/surface drainage infrastructure (including 2 no. foul treatment systems & percolation beds, 1 no. underground tank, and no. 3 stone soakways) as necessary to facilitate the development. Significant further information/revised plans submitted on this application
The proposed development consists of the following;
The development will consist of the extension and change of use
The brief summarizes the pattern across all 560 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record F18A/0086The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief