Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

23 Shenick Grove, Skerries, Co Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

23% of nearby decided applications were refused. The preview found 887 nearby planning records within 5 km where a location match is available.

Matched source
F18A/0159
Project type
One-off house
Coverage
5 km radius
887Nearby applications
23%Refused
681Conditional grants
12Refusal reasons

Top refusal reasons nearby

Visual Amenity3
Ecology2
Residential Amenity2
Zoning Contravention2
Design1

Nearest similar decisions

F18A/0159

Permission to demolish single storey structures to rear, convert garag

Granted0.0 km18 May 2018
F22B/0210

Construction of a first floor extension over existing converted garage.

Granted0.0 km08 December 2022
F24A/1038E

Retention Permission for development at 16 Shenick Ave, Holmpatrick, Skerries, Co.Dublin. K34 PX47. The development consist of: single storey garden room used as a home office and associated site works.

Refused0.0 km22 January 2025
F24A/0592

The development will consist of:

Granted0.0 km22 August 2024
F18A/0385

Demolition of existing double storey side extension, conservatory and

Granted0.0 km28 August 2018
F22A/0256

1) Construction of single storey front extension with lean to roof. 2) Construction of single storey side extension with open/pitched roof. 3) Attic conversion with rear dormer with flat roof. 4) Widening of existing vehicular entrance.

Granted0.0 km12 July 2022

The full report covers all 887 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required