Permission for removal of existing water storage
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Aer Lingus Head Office, Shamrock House, Castle Drive, Corballis Park,
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 3,488 nearby planning records within 5 km where a location match is available.
- Matched source
- F18A/0310
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Removal of existing reduntant fuel tank to existing rear plant area
The installation of the Thermal Storage tank permitted under Planning Reg Ref. F19A/0084 at a revised location to the east of the Terminal 2 Energy Centre, along with all associated site works including the erection of a new boundary fence around the Thermal Storage Tank. The tanks dimensions (16m x 4.8 m) and capacity (250m3) will remain unchanged. It will, as previously permitted, be used to store excess heat and improve the energy efficiency of the existing combined Heat and Power Plant serving Terminal 2.
Permission to amend a previous permitted development (Fingal County Council reg ref F21A/0255) located at Dublin Airport. The development proposed under the subject application relates specifically to Site A - Hotel Site. The development permitted on Site B, Site C and Site D is unaffected by this planning application. The proposed development, which provides for alterations to the permitted hotel development, comprises: the reconfiguration of the internal layout of all Levels of the permitted building (from Ground to Eleventh Floor Levels), to include amendments to the hotel bedrooms and related ancillary hotel facilities including entrance lobbies and reception spaces, meeting rooms, event / business space (with ancillary related spaces and public bar), administration, security office and staff facilities, restaurant with bar (and ancillary related spaces), leisure centre (including reception area and related facilities such as changing rooms, gym, treatment rooms, sauna, steam room and vitality room), toilets, waste storage area, bicycle store, ancillary space (which includes areas such as circulation cores (lifts and stairs) and routes, plant areas and storage areas throughout the building, electrical substations and switchrooms, toilets and shower areas etc.), and the omission of the permitted children's play room (kids club) and private dining area alterations to the Eleventh Floor Level's public bar's and executive lounge's south facing terrace; an increase in the size of the permitted retail unit by 9 sq m - from c. 188 sq m permitted to c. 197 sq m proposed); alterations to the permitted building's elevations; alterations to the permitted plant areas at Eleventh Floor Level and at Roof Level (and associated relocation of the roof plant screen, where required), including the relocation of the permitted weather radome and associated equipment room at Roof Level; and associated alterations to permitted hard and soft landscaping and permitted scheme's site services (mechanical and electrical, water supply, sewage disposal and surface water disposal), all on a proposed larger site area of 0.4859 for Site A (0.4715 ha permitted). The development also consists of the provision of a dedicated covered one-way service route to the rear of the permitted building at Ground floor Level, with associated automatic security roller shutters, intercom pillar and service area. Service route and yard access will be via the existing Terminal 2 Multi Storey Car Park access road, with egress will be via the Terminal 2 Multi Storey Car Park exit road in the west. The permitted designated drop-off / layby at the front of the hotel continues to be provided. The proposed development results in an increase in the permitted building's height (excluding weather radome) (from c. 41.5m permitted to c. 41.8m proposed) and alterations to the permitted extents of the building floorplates. The proposed development also results in an increase in the gross floor area of the permitted Ground, Second and Eleventh Floor Levels by c. 353 sq m in total (from c. 6,804 sq m floor area total permitted across these levels, to c. 7,157 sa m floor area total proposed across these levels), and a decrease in the size of the permitted First Floor Level by c. 5 sq m gross floor area (from c. 3,101 sq m floor area total permitted, to c. 3,096 sa m floor area total proposed) (there is no change proposed to the permitted gross floor areas of the Third, Fourth, Fifth, Sixth, Seventh, Eighth, Ninth and Tenth Floor Levels (c. 2,384 sq m floor area for each level or c. 18,784 sq m in total permitted)). The total gross floor area of the hotel building increases by c. 348 sq m (from c. 28,689 sq m permitted to c. 29,037 sq m proposed) with an increase in the number of hotel bedrooms from 410 No. permitted to 412 No. proposed.;Site B - Skybridge House (former TASC Building), Dublin Airport, townland of Collinstown, Co. Dublin; Site C - Site Compound 1 is bounded by the T2 Departure Road to the west and T2 Multi-storey Car Park to the east, Dublin Airport, townland of Corballis, Co. Dublin; and Site D - Site Compound 2 is located to the east of Swords Rugby Club in the townland of Stockhole, Co. Dublin.
Permission for development at 418.68 sq.m site. The development will c
An amendment to Planning Permission reference F19A/0084 as granted in respect of a new Thermal Storage Tank and all associated site works. The development will consist of: Replacement of the permitted single 250m3 horizontal storage vessel with 3 no. 80m3 vertical Thermal Storage Tanks arranged in series connection and all associated site works on a site of 418.68 sq.m. The tanks will measure 8m high by 3.8m diameter and have a combined capacity of 240m3 for the storage of hot water. They will be used to store excess heat and improve the energy efficiency of the existing Combined Heat and Power Plant serving Terminal 2.
Source match
Matched from public planning record F18A/0310The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report