Permission to construct first floor level extension to existing dwelli
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
3 Cherry Park, Swords, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 1,819 nearby planning records within 5 km where a location match is available.
- Matched source
- F18B/0254
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction consisting of: (i) raising the existing ridge line of the dwelling and building a dormer extension to the rear, (ii)A single storey extension to the kitchen at ground floor level consisting of kitchenette / office. Additional Information Received 03/02/2026 Significant Additional Information Received 25/03/2026
Construction of a 31.6sq/m ground floor extension to the rear of existing dwelling.
The development will consist of demolition of existing kitchen and living room to rear of house and erection of new single storey flat roofed extension to side and rear to accommodate new entrance foyer and extended living space to side and open plan kitchen, dining and living space to rear.
Planning permission for conversion of existing attic space comprising of modification of exisiting roof structure raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear at 38 The Nurseries, Forest Road, Swords, Co. Dublin, K67 W866.
Construction of a dormer to the side of existing roof profile.
The full report covers all 1,819 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F18B/0254The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report