Alterations to existing warehouse consisting of (a) increase in intern
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit J10, Swords Business Park, Swords, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 2,335 nearby planning records within 5 km where a location match is available.
- Matched source
- F19A/0014
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The retention permission of illuminated fascia signage to the front (south) elevation and side (east) elevation, the permission to erect 1 no. Totem Pole with illuminated signage and all associated works.
Planning permission is sought for: (1) Change of use of existing attic to home office/storage use (2) To replace the existing hipped roof with side gable with opaque window to the side (3) Flat roofed dormer to the rear roof (4) Rooflight to the front roof and all associated and ancillary site works
Construct a 2 storey extension to side/front of existing 2 storey semi
Permission is sought for the removal of part of Condition 1 of permission F18A/0754 - " This permission is for a period of 5 years only" for approved warehouse unit. We seek permission to maintain the warehouse unit permanently on lands within the Abco Kovex site, Swords Business Park, Swords, Co Dublin. AI received 04/12/23
Development of a single storey warehouse/light industrial unit. The d
The full report covers all 2,335 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19A/0014The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report