Permission to install 250kW of Roof Mounted Solar PV Panels and all as
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lissenhall Great, Swords, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 2,111 nearby planning records within 5 km where a location match is available.
- Matched source
- F19A/0073
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Install 250kW of Roof Mounted Solar PV Panels and all associated works on the roof of temperature controlled warehouse.
A new detached single storey bungalow dwelling to rear of garden of no
The construction of a single storey rear extension to existing two sto
The development consists of retention of a single storey portacabin of 120 sq.m. to the east of the existing building to accommodate 3 no. classrooms and toilet facility along with an access ramp; and all associated site and infrastructural works needed in order to facilitate the subject development. ** Additional Information Received 24/07/2025 **
Permission to replace an existing 20m monopole with a new 30m multi-user lattice tower telecommunications support structure carrying antenna and dishes enclosed within 2.4 metre high palisade fence compound together with associated ground equipment cabinets and associated site works including new pedestrian access gate.
The full report covers all 2,111 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19A/0073The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report