Applications tied to the site
Partial coverage50 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
50 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 2,984 decisions within 5 km, 50 exact-site or onsite candidate records, and 539 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
50 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
50 matched1 of 2 layers are loaded for Fingal County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Fingal County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Fingal County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched2 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 matched539 structured nearby appeal records.
539 matchedCitations are current-dated and carry policy name, section, page and source URL from the Fingal County Council development plan.
2 matchedOpen preview
Open preview
(1) The demolition of the existing warehouse building (856m²) and asso
(i) Demolition of the existing warehouse building (856sq.m.) and assoc
The development will consist of revisions to previously approved plann
The development will consist of: Retention of existing detached, singl
The revisions will consist of a) Construction of an additional third
Demolition of the existing warehouse building (856 sq.m) and associate
The brief summarizes the pattern across all 2,984 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record F19A/0636The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief