Retention permission for the change of use of attic to storage and pro
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
8 Forge View, Lusk, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
24% of nearby decided applications were refused. The preview found 1,158 nearby planning records within 5 km where a location match is available.
- Matched source
- F19B/0174
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission for attic conversion with dormer to rear and roof windows to accommodate stairs to allow access to attic conversion as non-habitable storage space, roof windows to front roof all with associated ancillary works.
New two storey pitched roof extension to front/side/rear & new entrance porch, revised vehicular access and all associated works at end terrace house. AI Received 03/05/2022 CAI received 20/6/2022
The development will consist of a 2-storey extension to the existing house, between the existing house and the site boundary to primarily allow for disabled adaption. AI received 28/11/23
Permission for development, consisting of 2 no. two storey, 3 bedroom houses, including all associated site development works, located on a site area of c. 0.05 Ha at Forge Green, the Forge, Lusk, County Dublin.
The development will consist of a single storey pitched roof extension to the side of existing two storey semi detached house comprising a bedroom and a shower room, and all associated site and ancillary works.
The full report covers all 1,158 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19B/0174The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report