The construction of a new gable wall to form new roof profile with Dut
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
19 The Rise, Skerries Rock, Skerries, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
22% of nearby decided applications were refused. The preview found 985 nearby planning records within 5 km where a location match is available.
- Matched source
- F19B/0232
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission is s sought for the construction of a new gable wall to form new roof profile to non-habitable attic space with 1 no. dormer window to rear, 1 no. roof window to front & to replace the vertical tiles with plaster in the front 2-storey bay window.
Permission for conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Attic conversion to include hipped roof to 'A' roof with new gable and to include a flat roof dormer window to rear roof slope along with associated internal alterations at first floor level.
Permission for removal of existing house return and conservatory and the construction of proposed new part single storey - part two storey extension to side and rear of existing house, new rooflight to side of existing roof and all associated site works.
Single storey side and rear extension to consist of WC, study, Kitchen
The full report covers all 985 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19B/0232The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report