The construction of a new dormer window to the rear of the existing r
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
18 Newcourt, Swords, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 2,200 nearby planning records within 5 km where a location match is available.
- Matched source
- F19B/0253
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission for the adaptation of the existing dwelling house and the construction of a seperate two storey, two-bedroom, end of terraced dwelling house (129m2) including all associated site and boundary development works at 78 Seatown Villas, Swords, Co. Dublin. AI received 10/11/23
Construct a 2 storey extension to side/front of existing 2 storey semi
Construct a 8mt high ball stop netting around the proposed new synthetic training area and associated training area and associated site works.
Retain the use of part of the exisiting first floor of the clubhouse as a Pre School Facility AI received 18/7/2022
The development will consist of the following: 1) The conversion of attic space to attic store including changing the existing hipped end roof to a dutch hip gable end roof, a new dormer window to the rear roof and 1 new rooflight to the rear roof. 2) 1 new double glazed window with permanent obscured glazing in the side gable wall of the house at attic level. 3) And all associated site works.
The full report covers all 2,200 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19B/0253The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report