Build new 2 storey extension to side of existing dwelling, with change of roof type from hip-roof to new gable end dutch-hip roof, together with new flat roof dormer extension & window to rear & 1 Nr. velux rooflight to rear & 1 Nr. velux rooflight to front with new windows to front at ground level. Internal alterations to include new stair access to first floor and associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
26 Forest Avenue, Swords, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 1,744 nearby planning records within 5 km where a location match is available.
- Matched source
- F19B/0332
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention Planning Permission for roof window to front of existing roof. Planning permission for an attic conversion to non-habitable storage space with 4 no. roof windows to side of existing roof and 2 no roof windows to rear roofs with ancillary works.
Permission for a detached for bedroom
Planning permission is sought for an attic conversion with dormer projecting window to rear and all associated site works.
First floor dormer extenswion (12.6m2) and single storey estension (24
Permission to erect a 5.2m x 1.85m x 2.8m high stainless steel and glass bus shelter with 2 No. internally illuminated Advertising Panels each of 2 sq. metre area on the public footpath at bus stop No. 733.
The full report covers all 1,744 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19B/0332The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report