Construct a new entrance lobby at the first floor level on the southern facade, install new pedestrian entrance off existing pedestrian access ramp on the western facade, to install two new windows in lower ground floor level on western facade, to construct a new roof cover to the existing pedestrian access ramp along the western facade and to construct new entrance porch roof over the existing entrance door at lower ground floor level on the eastern facade and to install a new window on the eastern facade at first floor level.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 12 Beat Centre, Stephenstown Industrial Estate, Balbriggan, Co Du
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
22% of nearby decided applications were refused. The preview found 701 nearby planning records within 5 km where a location match is available.
- Matched source
- F20A/0142
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the construction of four new padel courts (3 no. Will have a roof over), the erection of an associated modular amenity building and ancillary siteworks to include new access, parking area, bike racks, seating, landscaping, drainage & four totem signs (one located within the site, one located on the south-east corner of the site and two located on the footpath alongside the Harry Reynolds Road).
The development consists of retention permission for 3 no. external illuminated signage on the existing retail building's north elevation and all associated site works.
Revisions to development granted under F16A/0370 & nmodified under F17
Permission for development to consist of;
The proposed development will consist of (i) Installation of solar photovoltaic panels and associated fixtures and fittings on the roofs of the existing amenity building and forecourt canopy, and (ii) All other associated infrastructure and site development works.
The full report covers all 701 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F20A/0142The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report