The construction of a new two storey dwelling (280m²), a garage (44m²), replacement of existing disused vehicular entrance with new vehicular entrance in new location with existing roadside hedgerow replacement and re-alignment, a wastewater treatment system, demolition of an existing derelict dwelling and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Milestown Rath, Stamullen, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
28% of nearby decided applications were refused. The preview found 287 nearby planning records within 5 km where a location match is available.
- Matched source
- F20A/0346
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the addition of a dormer window to the rear roof and mi
Erect a 24m monopole telecommunications structure together with antennas, dished and associated telecommunications equipment enclosed by security fencing and extend existing access track.
A dormer dwelling to rear of existing family home site with new vehicu
Permission is sought for the construction of a horse training facility comprising of 24 horse stables, horse exerciser, paddocks, stable yard, gallop, dung store, wash area, car parking, on-site wastewater treatment unit and percolation area, new access gates (close 2 existing access gates), new vehicular access, new access road (6m wide) & all associated siteworks.
Permission is sought for a detached bungalow,
The full report covers all 287 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F20A/0346The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report