Construction of a new detached 1.5 storey dwelling, waste water treatment plant & percolation area, storm water percolation area, shared vehicular access and associated site works. AI deemed significant 05/07/21 SAI received 14/07/21 CAI received 13/08/21
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Milverton, Skerries, Co Dublin, K34 NT49
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
23% of nearby decided applications were refused. The preview found 1,035 nearby planning records within 5 km where a location match is available.
- Matched source
- F21A/0160
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Detached bungalow with integrated garage, on-site waste water treatmen
Retention planning permission for alterations carried out to the appro
Revisions to previously approved planning permissions Reg. Ref. F23A/0696. The proposed amended development will consist of the approved dwelling changing from a single-storey split-level arrangement to a single-storey single-level arrangement and reducing the footprint and area of the proposed dwelling from 127 sq. m to 99.81 sq. m
Revision to previously approved planning permissions registration reference F23A/0696 and F24A/0952E for change of house site orientation.
Planning permission is sought for a new split level single storey detached dwelling, new shared driveway entrance with existing family dwelling and all associated site works at Lambay Stud, Togher Hill, Milverton, Skerries, Co. Dublin.
The full report covers all 1,035 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F21A/0160The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report