The development consists of an existing telecommunications support structure (previously granted permission under Pl. Ref. F04A/0820) together with antennas, dishes, floodlights, for the GAA club, cabinets, fencing and all associated site development works. The development will continue to provide high speed wireless broadband and data services.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballymun Kickhams, Collinstown Lane, Cloghran, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 3,380 nearby planning records within 5 km where a location match is available.
- Matched source
- F21A/0318
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for temporary (12 months up to the end of 2021) change of use of 9.22 ha of existing Holiday Blue Car park for the development of a facility to provide for parking of Heavy Good Vehicles (HGV). The development comprises the reconfiguration of the existing car-parking area to provide 250 no. HGV parking spaces, as well as resurfacing of parking areas and internal roads. The development includes 10 no. prefabricated buildings comprising 2 no. 2.7m x 8.0m office units, 2 no. 2.7m x 8.0m canteen units, 4 no. 2.7 m x 5.0m bathroom units, 2 no. 2.7m x 6.0m shower units, proprietary waste-water treatment unit with percolation area, water connection to existing Irish Water service and ancillary works.
Temporary permission (5 years) for the temporary change of use of part
We, Frylite (Dublin) Ltd, intend to apply for permission for development/continuation of use at 'Frylite', Ballystruan Lane, Swords, Co. Dublin K67 K5X0. (The site was known and referred to in previous planning applications as the ABP Meat Processing Plant, St. Anne's Cloghran, Ballymun, Co. Dublin). The development will consist of temporary permission (5 years) for the the continuation of development granted temporary planning permission under P.A. Ref. F19A/0095. As per planning permission F19A/0095 the development consists of the continuation of the temporary change of use of part of the ABP meat processing plant from meat processing to a waste transfer and processing facility (non-hazardous wastes) providing for / incorporating: (a) The collection, processing, storage and bulking up of used and fresh cooking oil; (b) A waste transfer facility for food waste;(c) the washing of used cooking oil containers (d) a dissolved air floatation tank, (e) continued use of a portacabin office accommodation (permitted under P.A. Ref. F16A/0387), (f) continued use of part of the building for collection, storage and bulking up of used cooking oil, (g) use of 6no. existing silos for storage of fresh cooking oil and use of existing 1 no. silo for storage of used cooking oil, (h) 6 no. silos for storage of used cooking oil and, (i) all related site development works. A waste facility permit is required from Fingal County Council for this proposed development.
The proposed development consists of the following at Site C: The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit C) with a gross floor area (GFA) of c. 6,627 sq.m (including welfare and reception areas over two levels and c. 216 sq.m of ancillary office space). The proposed building will have a maximum height of c. 15.2 metres. Provision of 58 no. car parking spaces and 14 no. bicycle parking spaces. Provision of an ESB substation and switchroom. Provision of a service yard and HGV loading/unloading areas, with associated loading bays to the west of the proposed light industrial/warehouse/logistics building. Provision of access arrangements to the proposed development including an access from the permitted roundabout to the southwest of the site, and from the main estate access road to the east of the site. The proposed development consists of the following at site E: The construction of 2 no. light industrial/warehouse (including wholesale use) / logistics buildings (Units E1 and E2) with a gross floor area of 12,578 sq.m and 11,457 sq.m. respectively (including welfare and reception areas over two levels for each building and ancillary office space of c. 565 sq.m. and c. 497 sq.m respectively). The proposed buildings will have a maximum height of c. 15.6 metres. Provision of 239 no. car parking spaces (125 no. for Unit E1 and 114 no. for Unit E2) and 76 no. bicycle parking spaces (38 no. for each unit). Provision of an ESB substation and switchroom, 2 no. sprinkler tanks and 2 no. pumprooms. Provision of service yards and HGV loading/unloading areas, with associated loading bays to the south of the proposed light industrial/warehouse/logistics buildings. Provision of access arrangements to the proposed development including accesses from the main estate access road to the north, and the provision of a new estate road along the eastern side of Unit E2, proceeding to the rear of both buildings and providing access to the service yards. The proposal includes landscaping and planting, 3 no. bin stores/recycling structures, PV panel zones at roof level, boundary treatments, signage zones, site lighting, security fencing and gates and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems (including the provision of an integrated construted wetland to the south of Site E). An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application. AI received 19/8/2022
The proposed development consists of the following:
The full report covers all 3,380 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F21A/0318The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report