Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Lands locally known as the Celestica/Motorola site, Junction of Glen E

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

16% of nearby decided applications were refused. The preview found 1,853 nearby planning records within 5 km where a location match is available.

Matched source
F21A/0476
Project type
One-off house
Coverage
5 km radius
1,853Nearby applications
16%Refused
1,557Conditional grants
20Refusal reasons

Top refusal reasons nearby

Design4
Residential Amenity4
Visual Amenity3
Zoning Contravention3
Traffic Sightlines2

Nearest similar decisions

F21A/0476

A proposed stormwater storage tank and overlow outfall gravity sewer to the Broadmeadow River with associated manholes, proposed vehicular/service access onto Balheary Road; landscaping; boundary treatments; and all associated engineering and site works necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and is submitted to the Planning Authority with the application. AI Received 15/02/2022 AI deemed significant ** SAI received 23/2/2022 CAi Received 29/04/2022

Granted0.0 km23 May 2022
F25A/0792E

Retention permission is sought for the continued operation of a small-scale food service unit, La Papessa Pizza, and outdoor seating area on the grounds of St. Colmcilles GAA Club.

Refused0.2 km15 October 2025
F25A/0717

The development will consist of retention of an 8 foot long by 8 foot wide steel container which serves hot drinks & food positioned on part tarmacadam/grassed area with external tables/seating, and the change of use of part of car park to use as a coffee outlet/takeaway. Operating hours are Monday to Friday 7.30 to 15.00 & Saturday & Sunday 9.00 to 14.00.

Refused0.2 km22 September 2025
F25A/0402

Retention Planning Permission application. Development will consist of the retention of a 20 foot long by 8-foot-wide steel container which serves hot food & drinks positioned on part tarmacadam / grassed area with external tables / seating, and roof top signage and the change of use of part of car park to use as a food outlet / takeaway. Operating hours are Thursday to Saturday 12:00 to 14:30 & 17:00 to 22:00, & Sunday 18:00 to 21:00.

Refused0.2 km25 June 2025
F25A/0169E

Permission for: 1) Material change of use of the existing unit from office to healthcare clinic. Including the provision of 4 no. consultation rooms, 1 no. physiotherapy room and ancillary rooms required to facilitate the medical use. 2) Provision of new wheelchair ramp to the front of the unit, including associated handrails and balustrades, to allow level access to the unit. 3) All associated works including drainage, landscaping, boundary treatments necessary to facilitate the development. AI Received 08/05/2025

Granted0.2 km28 May 2025
F26A/0117E

Permission for the: 1) Material change of use of the existing unit from office to healthcare clinic. Including the provision of 6no. medical rooms and ancillary rooms required to facilitate the medical use. 2) Provision of dedicated long and short stay bicycle parking and storage area for the unit. 3) All associated works including drainage, landscaping, boundary treatments necessary to facilitate the development.

Granted0.2 km10 April 2026

The full report covers all 1,853 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required