Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

ESB's Stephenstown 110kV Substation Site, Outer Relief Road, Balbrigga

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

22% of nearby decided applications were refused. The preview found 737 nearby planning records within 5 km where a location match is available.

Matched source
F21A/0567
Project type
One-off house
Coverage
5 km radius
737Nearby applications
22%Refused
573Conditional grants
9Refusal reasons

Top refusal reasons nearby

Design2
Visual Amenity2
Zoning Contravention2
Other1
Residential Amenity1

Nearest similar decisions

F21A/0567

Permission to erect a 30m monopole type structure carrying communications antennae and dishes within a proposed 2.4m high palisade fenced and landscaped compound, along with associated ground-mounted equipment, to be shared with multiple operators. AI received 24/2/2022

Granted0.0 km22 March 2022
F19A/0104

Minor amendments to planning permission number F15A/0288 incorporating

Granted0.0 km17 April 2019
F23A/0634

An Environmental Impact Assessment Report (EIAR) has been submitted with this application. Permission for development at the existing waste recovery facility located at Stephenstown Business Park, Stephenstown, Balbriggan, County Dublin, K32X996. The development will consist of: (i) An increase in the total annual waste intake to 95,500 tonnes per annum for recovery; (ii) Revision of operating hours to include public holidays; (iii) Ancillary works comprising a covered bicycle store (6 no. spaces) and reconfiguration of the existing car parking area (7 no. car spaces and 1 no. motorcycle space) to include an electric vehicle charging point and associated underground cable ducting. The development will comprise an activity requiring a review of the existing Industrial Emissions licence (EPA reference no. P1014-01). AI received 08/02/24

Granted0.2 km03 April 2024
F18A/0535

The development will consist of a first floor extension to the main bu

Granted0.2 km15 November 2018
F20B/0268

The development will consist of the demolition of existing extensions to cottage with the construction of a dormer style extension to rear & all associated site works. AI received 23/09/21 AI deemed significant revised public notices (SAI) received 12/10/21

Granted0.2 km08 November 2021
F18A/0010

Single storey extension to rear of existing industrial unit & the demo

Granted0.2 km06 March 2018

The full report covers all 737 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required