Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Unit B3A Airport Business park, Cloghran, Swords Road, Co Dublin, K67

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 3,496 nearby planning records within 5 km where a location match is available.

Matched source
F21A/0631
Project type
One-off house
Coverage
5 km radius
3,496Nearby applications
11%Refused
3,098Conditional grants
15Refusal reasons

Top refusal reasons nearby

Residential Amenity4
Design3
Visual Amenity3
Traffic Sightlines2
Zoning Contravention2

Nearest similar decisions

F21A/0631

Retention planning permission is being sought for the incorporation of external loading bay, replacement of two roller doors with sectional doors, replacement of existing emergency escape doors and all ancillary works.

Granted0.0 km18 January 2022
F25A/1219E

This development will consist of Planning Permission to extend to the side of existing unit to provide new attached additional storage building and all associated site works.

Granted0.0 km24 February 2026
F21A/0258

The development will consist/consists of: Retention permission consists of change of use to assembly/education from industrial to provide practical apprentice teaching facilities associated with the functioning of Dublin Airport in accordance with Development Plan Objectives ED30, ED32 and ED34 and Dublin Airport Local Area Plan Objectives ED01 and ED02. The permission application will consist of minor alterations to 2no existing facade openings consisting the addition of new facade and windows, which will be removed at the end of temporary use, and internal alterations to include the addition of an external escape door, window and an internal gantry of 38sqm.

Granted0.1 km23 June 2021
F20A/0331

The temporary continuance of use of the existing 2,700 long-term car parking spaces. The existing 2,700 long-term car parking spaces are currently used for the same purpose under and in accordance with the existing temporary planning permission reg. ref. PL06F.PA0030 from An Bord Pleanála. Temporary permission is sought for a further period of 7 years from the date of expiry of the existing temporary planning permission PL06F.PA0030 from An Bord Pleanála (7th May 2021). The proposed development includes the continuance of use of all existing ancillary infrastructure and facilities, such as the access from the R132, existing internal circulation roads including bus turning circles, 4 no. bus shelters, 1 no. security hut, lighting, boundary fencing, ticket machines and barriers, CCTV cameras, internal car park signage, existing drainage network including existing surface water attenuation areas, and all existing landscaping. Add Info received 2nd October 2020.

Granted0.2 km29 October 2020
F22A/0029

Rehabilitation works to existing 'Purple Zone' staff car park to include resurfacing, lighting, road markings and signage, ducting for EV charging points, and all associated site works and ancillary development. No increase in parking capacity is proposed. It is proposed that staff parking will be facilitated within the northern section of the 'Express Red' long term car park (also known as the 'Express Green' car park), located to the east of the 'Purple Zone' staff car park in the townland of Cloghran, Co. Dublin, for the duration of the works.

Granted0.2 km10 March 2022
F22A/0510

The installation of an ESB substation and switchroom on site.

Granted0.2 km16 November 2022

The full report covers all 3,496 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required