Conversion of attic to storage including 3 no. velux rooflights to the front at roof level.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
26 The Avenue, Robswall, Malahide, Co Dublin, K36PP86
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 1,948 nearby planning records within 5 km where a location match is available.
- Matched source
- F21B/0003
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Proposed new dormer to front roofslope of existing dwelling
Conversion of attic to storage including 3 no. velux rooflights to the front at roof level.
Retention of attic storage space as constructed (in accordance with Reg Ref. F21B/0004) including 2 new Velux rooflights to the rear, enlarging one existing Velux rooflight to the rear, enlarging one front rooflight from a Velux PK08 to a Velux PK10, raising of floor level and reduction in floor area. Permission is also sought for the construction of a shower room within the constructed attic storage space, note use to remain as non-habitable storage.
Planning Permission for the alterations of the existing attic to accommodate a proposed new dormer to the front roof slope of the existing dwelling, attic conversion and all associated ancillary site works at Number 22 The Avenue, Robswalls, Malahide, K36V656.
Permission for single storey garden room in rear garden for use ancillary to the house.
The full report covers all 1,948 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F21B/0003The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report