Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

19 Ormond Way, Mooretown, Swords, Co Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

17% of nearby decided applications were refused. The preview found 1,530 nearby planning records within 5 km where a location match is available.

Matched source
F21B/0267
Project type
One-off house
Coverage
5 km radius
1,530Nearby applications
17%Refused
1,275Conditional grants
11Refusal reasons

Top refusal reasons nearby

Design3
Residential Amenity2
Traffic Sightlines2
Other1
Premature Services1

Nearest similar decisions

F21B/0267

Permission for (1) Hip roof dormer with obscure glazing in existing roof-hip on the side elevation. (2) Roof lights in the roof to the front of the dwelling. (3) Converting the attic space for non-habitable use with stair access from the first floor landing. (4) All associated works.

Granted0.0 km03 September 2021
F17B/0301

Construction of an extension to side and rear of dwelling

Granted0.0 km15 February 2018
F21B/0307

(1) Replacing the existing hip roof with a 'half-hip' type.

Granted0.0 km20 October 2021
F23A/0293

Planning permission for the construction of

Refused0.0 km20 July 2023
F18B/0300

A new dormer roof to the side of the existing house roof and all ancil

Granted0.0 km13 December 2018
F22B/0178

Development will consist of a proposed new Dutch hip gable wall & new window to the side of the existing house and a new dormer roof to the rear of the existing house roof and all ancillary works.

Granted0.0 km05 October 2022

The full report covers all 1,530 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required