Planning permission to alter and demolish part of the boundary wall to create a vehicular access onto Howth Road, to replace areas of grass and planting with stone pebble at front and side of the Church building to facilitate additional parking within the site and associated site works. AI received 18/5/2022
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Howth Presbyterian Church, Howth Road Quarry, Howth, Dublin 13
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 1,479 nearby planning records within 5 km where a location match is available.
- Matched source
- F22A/0090
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Replace area of grass / lawn with stone pebble at front of Church
Retention permission for changes to Protected Structure dwelling to include: Alteration to vehicular gateway, new side passage screen wall and gate, new wellhead coping wall, new rear external double door, changes to partitions at upper level, and associated changes to landscaping.
The development will consist of demolition of existing
Demolition of the existing conservatory
Demolition of existing single storey extension to rear (north) of existing dwelling; and permission for new part single storey and part 2 storey extension to rear (north) and side (west) of existing dwelling, internal alterations and associated elevation changes, landscaping, and ancillary site works.
The full report covers all 1,479 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F22A/0090The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report