Change of use of the existing vacant core aviation office use building (as granted planning permission under F18A/0436) to new use as Minor Injury & Wellness Clinic (urgent Care service).
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Corballis Cottage, Old Airport Road / Swords Road (R132), Dublin, K67
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 3,463 nearby planning records within 5 km where a location match is available.
- Matched source
- F22A/0097
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
A) Completion of partially constructed part-two, part-three storey Cor
Rehabilitation works to existing 'Purple Zone' staff car park to include resurfacing, lighting, road markings and signage, ducting for EV charging points, and all associated site works and ancillary development. No increase in parking capacity is proposed. It is proposed that staff parking will be facilitated within the northern section of the 'Express Red' long term car park (also known as the 'Express Green' car park), located to the east of the 'Purple Zone' staff car park in the townland of Cloghran, Co. Dublin, for the duration of the works.
The proposed development shall consist of a new standalone 8-12 -storey (over partial basement) hotel consisting of the following:- a) Kitchen, plant and back of house services at basement level; b) Double height reception, restautant/bar/lounge area at ground floor; c) Kitchen, staff facilities, storage rooms, bin stores and toilets at ground floor; d) Outdoor seating areas at ground floor level; e) 300 no. hotel bedrooms at 1st to 11th floors; f) Plant at roof level; g) New landscaped entrance courtyard between the existing and proposed hotels; h) Coach set down and car drop -off area at entrance to new hotel; i) Reconfiguration of car park to rear of existing hotel; j) Provision of 15 no. car parking spaces in service yard to rear of existing hotel; k0 Security hut, bicycle parking and all assoicated landscaping, signage site works and services. AI received 21/07/21 CAI received 26/10/21
The proposed development shall consist of the construction of a 1-6 storey extension (over lower ground) to the existing hotel consisting of the following: (a) Demolition of part of existing staff room at lower ground level, glazed entrance at ground floor and balconies on the side (south) elevation; (b) Construction of a new leisure facility including swimming pool and gym at ground floor; (c) 55 no. additional hotel bedrooms at 1st to 5th floor levels bringing the total to 284 bedrooms; (d) Plant at lower ground and roof level; (e) New landscaped entrance courtyard; (f) Works to elevation of existing hotel facade including new entrance and canopy; (g) Security hut, bicycle parking, underground attenuation and all associated landscaping, signage, site works and services. AI received 21/07/21 CAI received 26/10/21
The temporary continuance of use of the existing 2,700 long-term car parking spaces. The existing 2,700 long-term car parking spaces are currently used for the same purpose under and in accordance with the existing temporary planning permission reg. ref. PL06F.PA0030 from An Bord Pleanála. Temporary permission is sought for a further period of 7 years from the date of expiry of the existing temporary planning permission PL06F.PA0030 from An Bord Pleanála (7th May 2021). The proposed development includes the continuance of use of all existing ancillary infrastructure and facilities, such as the access from the R132, existing internal circulation roads including bus turning circles, 4 no. bus shelters, 1 no. security hut, lighting, boundary fencing, ticket machines and barriers, CCTV cameras, internal car park signage, existing drainage network including existing surface water attenuation areas, and all existing landscaping. Add Info received 2nd October 2020.
Source match
Matched from public planning record F22A/0097The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report