Replacement of existing horticultural polytunnels with new horticultural polytunnels together with associated site works. AI received 26/01/23
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Brazil, Swords, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
18% of nearby decided applications were refused. The preview found 1,320 nearby planning records within 5 km where a location match is available.
- Matched source
- F22A/0284
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for (A) the change of use of two existing staff accommodation buildings to ancillary office and storage accommodation associated with Keelings existing farm business,; and (B) the temporary retention of four ancillary structures/buildings used to facilitate safe operation procedures associated with Covid 19.
(i) The removal of two number existing single storey accommodation bui
The construction of one new dwelling, biocycle treatment system, soakaway, new boundary walls, new utility connections, alterations to existing vehicular entrance, and all associatd site works.
The upgrade and relocation of an existing agricultural entrance.
The construction of a single storey rear extension, 2 No. rooflights to the front and the installation of a new packaged waste water treatment system with polishing feature/percolation area and driveway widening with altered path with dished kerbs along with the associated site works.
The full report covers all 1,320 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F22A/0284The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report