Construction of a mixed use scheme comprising 21 No residential units (15 no. houses, 5 no duplexes and 1 no. apartment) and a community workhub facility, as follows: (a) construction of a two-storey residential block (Block A) comprising 4 no. two-bed duplex units (house Type 4); (b) construction of a three-storey mixed use block (Block B) comprising community workhub facility consisting of community workhubs, office, kitchenette, store, buggy store at ground floor level and 2 no. residential units 1 no two-bed duplex (House type 6) and 1 no. two-bed apartment (House type 5) at first and second floor levels (c) construction of 15 no. dwellings consisting of (i) 5 no. two-storey (with attic/dormer conversion) four-bed terraced dwellings (House type 3). Each residential unit will be provided with an area of private amenity space in the form of a private rear garden or terrace. Each unit will also be provided with solar PV panels at roof level; (d) construction of a single storey bin store to serve Block A apartments; (e) the scheme will be served by 46 no. car parking spaces to include 2 no. EV spaces; 2 no. disability spaces and 9 no. visitor spaces and 60 no. cycle parking spaces (including 30 no. to serve the dwellings; 20 to serve the apartments and community hub; and 10 no. to serve the public). Access to the scheme will be from Hand's Lane to the west (vehicular and pedestrian) and from Bollum Lane to the north (pedestrian only) and (f) all associated site and infrastructural works, including foul and surface water drainage; hard and soft landscaping, refuse stores, internal footpaths and road, lighting, signage and public open space necessary to facilitate the development
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands zoned TC- Town Centre, To the east of Hands Lane and south of Bo
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
27% of nearby decided applications were refused. The preview found 886 nearby planning records within 5 km where a location match is available.
- Matched source
- F22A/0690
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Construction of single storey bedroom and bathroom extension to side/rear of existing dwelling house, and associated site works.
Permission is sought to convert the existing single-story garage to the side of the existing cottage to habitable space and to connect the converted garage to the existing cottage. The proposed works will also include removing one chimney on the existing cottage and installing windows in the front and rear facades of the converted garage.
Two storey dormer style detached house
Permission for alterations and two storey extension to house. AI received 10/09/21
The proposed development will consist of: a. Subdivision of existing family landholding with provision of new internal boundary to the rear of existing family home to facilitate the construction of a new 11/2 storey, 3 no. bedroom, infill residential dwelling )c.144.5 sqm GFA ). b. Provision of ''Velux'' rooflights to the north and south of the proposed dwelling. c. Alterations to existing detached house including the closing up of existing side entrance door and the relocation of existing side entrance gate, boiler and oil tank to facilitate vehicular access to serve the proposed site. d. The provision of 1 no. within curtilage car parking space to serve the proposed new dwelling. e. All associated site development and engineering works necessary to facilitate the development. Additional Information received 24/07/25
The full report covers all 886 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F22A/0690The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report