Permission is sought for construction of a part 2 storey/part single storey extension to side of existing dwelling. AI received 11/11/2022
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
24, Shenick Park, Skerries, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
24% of nearby decided applications were refused. The preview found 889 nearby planning records within 5 km where a location match is available.
- Matched source
- F22B/0196
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Single storey extension to the front and rear,
(1) Demolition of existing single storey extension to side, (2) 2 storey extension to the side. (3) partial 2 storey/single storey extension to the rear. (4) porch canopy over front door and (5) internal alterations to existing dwelling.
Permission sought for the construction of a 1st floor extension to side & rear of existing dwelling, a new gable wall to form new roof profile to non-habitable attic space with 1 no. dormer window to front, conversion of existing garage to habitable accommodation, bay window & canopy to front elevation, internal alterations & widen existing vehicular entrance to 3.6m wide.
Planning permission is sought to etend the existing house to the rear
Planning permission is sought for a mobility scooter storage enclosure with flat roof, external steps with chair lift and associated handrails, and to widen existing driveway entrance.
The full report covers all 889 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F22B/0196The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report