Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

93 Main Street, Swords, Co. Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

15% of nearby decided applications were refused. The preview found 2,145 nearby planning records within 5 km where a location match is available.

Matched source
F23A/0093
Project type
One-off house
Coverage
5 km radius
2,145Nearby applications
15%Refused
1,819Conditional grants
16Refusal reasons

Top refusal reasons nearby

Design4
Residential Amenity3
Visual Amenity3
Traffic Sightlines2
Zoning Contravention2

Nearest similar decisions

F23A/0093

Permission for change of use of existing the ground floor launderette to a retail off-licence & takeaway coffee hub, minor changes to internal layout, alterations to existing shop front signage and all other associated site works. Gross floor area of change of use 145m2.

Granted0.0 km04 May 2023
F18A/0083

A new render finish over the existing brick finish to the existing nor

Granted0.0 km05 April 2018
F24A/0408

Permission for change of use

Granted0.0 km24 June 2024
F25A/0150E

The development will consist of the construction of a temporary primary school building, single storey with two classrooms, by way of construction of a prefabricated modular building with associated site works. Retention planning permission is also sought for two existing primary school modular buildings, single storey with two classrooms. Temporary Permission for a period no longer than 5 years is being sought. AI Received 22/05/2025 SAI Rcvd 10/06/2025

Granted0.1 km03 July 2025
F19A/0164

The provision of a temporary primary school by way of construction of

Granted0.1 km19 July 2019
SHD/020/19

To view details of this Strategic Housing Development please visit www.mainstreetswordsshd.com. ABP-306771-20 (i) Demolition of the existing 1-3 storey public house, restaurant and off-licence and associated storage buildings (totalling 1,197 sq.m. and removal of associated car park; (ii) Construction of a residential development providing a total of 172 no. residential apartments (comprising 67 no. one-bed units, 101 no. two-bed units and 4 no. two-bed units) in 4 no. four-seven storey blocks over basement. Each apartment has associated private open space in the form of a ground floor terrace or balcony and has access to 3 no. communal amenity spaces (totalling 296 sq.m.), including a communal gym (77 sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from Church Road) providing a total of 132 no. parking spaces (including 6 no. mobility impaired user parking space and 5 no. club car parking spaces), and 408 no. bicycle spaces (336 no. resident spaces at basement level and 72 no. visitor spaces at ground floor level in the central courtyard; (iii) 2 no. commercial units (comprising 394 sq.m. and 296 sq.m. and accommodating Class 1,2 and 8 uses as per the Planning & Development Regulations, 2001-2019, as amended); a c235 sq.m. creche and 87sq.m café at ground floor level; (iv) removal of existing culverts, installation of new culverts to facilitate pedestrian and vehicular access and diversion of the Glebe Stream on site; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. A Natura Impact Statement has been prepared in respect of the proposed development. Please note all submissions to be lodged with An Bord Pleanála, 64 Marlborough Street, Dublin 1 and must be accompanied by the prescribed fee of €20.00.

Refused0.1 km28 July 2020

The full report covers all 2,145 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required