Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Donabate Community College, Portrane Road, Ballisk Common, Donabate, C

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

19% of nearby decided applications were refused. The preview found 1,415 nearby planning records within 5 km where a location match is available.

Matched source
F23A/0258
Project type
One-off house
Coverage
5 km radius
1,415Nearby applications
19%Refused
1,142Conditional grants
6Refusal reasons

Top refusal reasons nearby

Visual Amenity2
Design1
Protected Structure1
Residential Amenity1
Zoning Contravention1

Nearest similar decisions

F23A/0258

The development will consist of the installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electricity connection.

Granted0.0 km06 July 2023
F19A/0630

Construction of 2 no. prefabricated buildings to provide for changing and associated toilet facilities and all associated site development works.

Granted0.1 km18 February 2020
F25A/0730E

The development will consist of a residential scheme providing 28 no. units in total. The scheme comprises: (i) the construction of 9 no. two-storey buildings, consisting of 17 no. one-bedroom apartments and 1 no. ground floor level community facility in the form of a multi-purpose room with storage space. A communal garden is provided to the rear of the proposed communal facility. Each of the 17 no. apartments proposed is provided with private amenity space to the rear (west) and 1 no. car parking space provided to the front (east). These 17 no. one-bedroom apartments and the associated communal facility are provided on-site for visually impaired persons and will be provided in association with The National Association of Housing For The Visually Impaired (NAHVI), an Approved Housing Body (AHB). The proposed development also includes: (ii) the construction of 11 no. two-storey, three bedroom, terraced dwellings, each served with private amenity space to the rear and 1 no. on-curtilage car parking space; (iii) the provision of 1,018 sq.m of open space; (iv) the provision of new road surfaces and footpaths, with access to the development site provided from the existing road network in 'The Paddocks' Residential Development to the east; and (v) all associated works including landscaping, boundary treatments and drainage, necessary to facilitate the development.

Refused0.1 km06 October 2025
F23A/0523

Planning permission for the construction of an all-weather astro pitch/warm up area with perimeter fencing, and all associated site development works.

Granted0.1 km24 October 2023
F19A/0253

The development will consist of 1) Telecommunication cabin measuring 1

Granted0.1 km07 August 2019
F25A/0149E

Permission is sought for a development that will consist of the construction of a temporary primary school building, two storey with four classrooms, by way of construction of a prefabricated modular building with associated site works. Retention planning permission is also sought for two existing primary school modular buildings, single storey with two classrooms. Temporary Permission for a period no longer than 5 years is being sought.

Granted0.1 km22 April 2025

The full report covers all 1,415 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required