Planning permission is requested for new all-weather training area (45m x 25m) to south of existing clubhouse along with associated floodlighting (4 x 12m columns), perimeter fencing and all associated siteworks. AI Rcvd 16/09/2024
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Bath Road, Balbriggan, Co. Dublin, K32 P793
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
24% of nearby decided applications were refused. The preview found 574 nearby planning records within 5 km where a location match is available.
- Matched source
- F23A/0688
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission is requested for retention of existing single-storey porch extension to front and single-storey extension to rear of existing two-storey dwellinghouse.
The site is located within the curtilage of a Protected Structure (RPS Ref 0019 - Chimney of former Sea Mills Hosiery Factory). The development will consist of amendments to the Nursing Home development granted under planning Reg. Ref F17A/0295 (An Bord Pleanála Ref ABP-300673-18) and as amended under planning Reg. Refs F20A/0430 and F21A/0020 comprising:- Reconfiguration of the car park and access road to provide 3 additional parking spaces; Upward extensions at each end of the building at second floor to accommodate 6 no. additional bedrooms.
Permission for amendments to the Nursing Home development granted under planning Reg. Ref, F17A/0295 (An Bord Pleanála Ref. ABP - 300673-18) and as amended under planning Reg. Ref. F20A/0430 comprising:- Repositioning and reconfiguration of 2 stair cores to comply with Building Regulations and the requirements of Fire Safety Certificate Ref. 20/4081. The amended stair cores will project out from the western and northern elevations at all levels and will partially extend into the 2nd floor set-backs at each end of the building. The site is located within the curtilage of a Protected Structure (RPS Ref. 0019 - Chimney of Former Sea Mills Hosiery factory.
The Site is located within the curtilage of a Protected Structure (RPS Ref:- 0019 - Chimney of Former Sea Mills Hosiery Factory) The development will consist of amendments to the Nursing Home Development granted under planning Reg. Ref. F17A/0295 (An Bord Pleanála Ref. ABP-300673-18) comprising the construction of a ground floor plant room at the location of the permitted bin store and the provision of a new bin store.
Permission and Retention Permission for development on a site located within the curtilage of a Protected Structure (RPS Ref. 0019 - chimney of Former sea Mills Hosiery Factory). The development will consist of amendments to the Nursing Home development granted under planning Reg. Ref. F17A/0295 (An Bord Pleanála Ref. ABP-300673-18) and as amended under planning Reg. Refs F20/0430, F21A/0020 and F21A/0265. Retention Permission is sought for 2 no. additional windows at second floor in the northern wing of the building. Permission is sought for:- - 6 no. additional bedspaces within the permitted floor area of the building, 3 no. large bedrooms will become double bedrooms (3 additional bedspaces) and 2 office spaces will become a double bedroom and a single bedroom (3 additional bedspaces). The amendments will increase the no. of bedrooms from 96 to 98 and the number of bedspaces from 96 to 102. - 2 no. additional car parking spaces (total 26) to serve the extra bedspaces. - Minor amendments to the southern elevation at second floor to provide metal cladding over part of the facade. AI received 22/3/2022
The full report covers all 574 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F23A/0688The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report