Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Ryanair DAC of Corporate Head Office, Airside Business Park, Swords, C

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

15% of nearby decided applications were refused. The preview found 2,254 nearby planning records within 5 km where a location match is available.

Matched source
F23A/0809
Project type
One-off house
Coverage
5 km radius
2,254Nearby applications
15%Refused
1,923Conditional grants
11Refusal reasons

Top refusal reasons nearby

Design3
Residential Amenity2
Traffic Sightlines2
Premature Services1
Protected Structure1

Nearest similar decisions

F23A/0809

The construction of a 169sqm single-storey extension

Granted0.0 km22 February 2024
F25A/0131E

Planning permission for a development comprising the replacement of existing fascia signage with new internally illuminated fascia signage (3820mm x 500mm) on the south (front) elevation.

Granted0.1 km14 April 2025
F24A/0875E

Applying for permission for Replacement of existing "Garden Centre" sign (approx. 3.8m wide x 2.0m high) with new 6.25m wide x 2.5m high internally illuminated sign on front (south-east facing) elevation of B&Q premises.

Granted0.1 km13 November 2024
F24A/0023

The development will consist of:

Refused0.1 km13 March 2024
F18A/0467

The construction of a six-storey office building plus rooftop plant, s

Granted0.2 km13 December 2018
F23A/0083

The development will consist of the demolition and reinstatement of existing hotel floorspace (c. 175 sq m) at ground floor level, internal alterations to the existing hotel floorspace (including the removal of 3 No. existing hotel bedrooms) at ground and first floor level and the demolition of an existing ESB substation (c. 31 sq m). The development will also consist of: the construction of a 4 storey hotel extension (max. height c. 13.8m to top of plant / staircore) measuring c. 1,944 sq m to the front (south-west) of the existing hotel building, comprising 55 No. hotel bedrooms, a plant room and store rooms. The proposed development will result in a total of 182 No. hotel bedrooms and an overall Gross Floor Area of c. 6,066 sq m. The development will also include the provision of a replacement ESB substation (c. 31 sq m); 2 No. internally-illuminated signs, each having a display area of c. 3.3 sq m, located on the proposed south- east and north-west building elevations; lift access and stair cores; reduction in car parking spaces (from 116 No. to 103 No. spaces); bicycle parking; modifications to the existing vehicular entrance; minor alterations and part removal of the existing south-west boundary treatments; hard and soft landscaping; changes in level; drainage works; green roof; piped infrastructure and ducting; roof plant; and all associated site excavation works above and below ground. AI received 01/08/23

Granted0.2 km28 August 2023

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required