The proposed development will consist of: (i) Installation of new 4,750 lt aboveground self bunded fuel storage tank with Integrated Dispenser, II. Associated signage, III. All associated site development works. AI Recvd 20/1/25
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Circle K Westview Service Station, Lanestown, Swords, Co Dublin, K67 N
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 1,796 nearby planning records within 5 km where a location match is available.
- Matched source
- F24A/0946E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission is sought for a Petrol Filling Station to include: (1) A forecourt area with 4 no. fuel pump islands, illuminated forecourt canopy over, 3 no. underground fuel storage tanks (2 x 40,000 & 1 x 60,000 litres), associated pipework, overground fill points, vents & associated infrastructure. (2) A car wash area with 2 no. car wash bays, associated underground water storage tanks, drainage & Plant Room (floor area 6sqm). (3) On-site facilities including car services areas, car & bicycle parking, drive tru/delivery lane, loading area, pedestrian routes & associated line markings. (4) Illuminated Operator Signage including main ID Totem sign, canopy & facade signage. (5) An amenity building (floor area 758 sqm) which will include a convenience shop (100 sqm net retail area), restaurant/cafe area with 2 no. food offerings with hot & cold meals & refreshments for sale for consumption on & off the premises, associated drive tru facility, customer seating, customer WC's, Back of House area with food preparation areas, ancillary office, staff welfare facilities, storage & plant areas. (6) All site drainage works, including rainwater harvesting, attenuation & foul drainage and (7) all associated lighting, landscaping, boundary treatments & site development works. All access roads, services, landscaping & associated siteworks approved under F19A/0463.
A detached warehouse unit with 2 storey ancillary offices to front, floor area 952m2, max height 12.53m. All access roads, services, landscaping & associated siteworks approved under F19A/0463. AI received 23/07/21 CAI received 25/08/21 CAI deemed significant Revised public notices (CAI) received 07/09/21
Phase 1 of development. Phase 1 consists of (i) Access roads, foul & storm water services, watermain & all associated site works (ii) A detached 947m² Car Showrooms & Service Bays (iii) A detached 467m² Management Unit (iv) A detached 1,387m² Car Test Centre (v) A detached 1,949m² Builders Providers & (vi) A detached 14m² ESB sub-station. Add Info received 19th February 2020. Clarification of Add Info received 5th June 2020.
The development will consist of the construction of a 60 sq.m rear and side extension consisting of kitchen/dining/living area, a playroom and new bathroom. Increase height of existing flat roof by 600mm. Relocation of entrance at front elevation. The change of use of existing living room to bedroom. Demolition of existing concrete block shed, 15 sq.m. Replacement of existing septic tank with new waste water treatment plant and associated site works.
1. Change of use from warehouse storage to offices with ancillary storage; 2. Construction of a mezzanine floor (79.33 sq.m.) between Ground & First Floor levels for storage; 3. Partial infill of First Floor (73.50 sq.m.) to provide office space; 4. Construction of passenger lift, and 5. Amalgamation of two units.
The full report covers all 1,796 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F24A/0946EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report