We McHale Plant Hire Limited intend to apply for Planning Permission for the inclusion of a new foul sewer rising main and portion of gravity foul sewer plus associated decommissioning and removal of an existing on-site wastewater treatment plant at Staffordstown Business Park, Turvey, Donabate, Co. Dublin. The proposed foul sewer rising main will serve the Business Park by forming connection with an existing pump station on site with this rising main routed out of the Business Park down Turvey Avenue public road to the east, 2.5km approx. to a new discharge manhole connected to a proposed gravity foul sewer (ca. 585m long) to subsequently form connection with the existing Uisce Eireann foul sewer on Turvey Avenue adjacent to Turvey Woods Residential Development. The placement of this rising main will result in the decommissioning and removal of the existing treatment plant and associated percolation area in the Business Park.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Staffordstown Business Park, Turvey, Swords, Co. Dublin, K36X580
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
18% of nearby decided applications were refused. The preview found 1,661 nearby planning records within 5 km where a location match is available.
- Matched source
- F24A/1004E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of a prefabricated lightweight metal frame single-storey workshop building (600sq.m) along with rainwater harvesting.
Retention of changes to approved permission F07B/0430 plus the addition of 1 front (south) facing 1.1 m sq skylight, 4 no. rear (north) facing 1.1 m sq skylights and a rear (north) facing dormer to facilitate attic toilet/shower room 8.6 sqm with new stairs for access.
1) Alterations and Single Storey Extension to side of existing Industrial Unit by 91sqm, 6450mm High at High Point and 5852mm at Eaves Level, together with All Ancillary Works.
Permission for a small-scale Waste Electrical and Electronic Equipment (WEEE) and Battery Storage and Transfer Facility, The applicant intends on accepting WEEE and Battery waste from permitted operators at this facility for temporary storage in UN approved containers prior to onward dispatch to authorised WEEE and Battery waste treatment facilities. The applicant intends on accepting a maximum of 520 tonnes of WEEE and Battery waste on-site per annum. A maximum of 20 tonnes of WEEE/Battery will be stored on-site at any one point in time. No on-site processing or treatment of WEEE/Battery waste will be undertaken at this facility. A Waste Facility Permit is required for the proposed activity under Classes 1 and 9 of Part 1 of the Third Schedule of the Waste Management (Facility Permit & Registration) Regulations 2007, as amended. The applicant intends on obtaining such a Waste Facility Permit. AI received 27/07/21
First floor office space at an existing warehouse unit.
The full report covers all 1,661 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F24A/1004EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report