Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Staffordstown Business Park, Turvey, Swords, Co. Dublin, K36X580

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

18% of nearby decided applications were refused. The preview found 1,661 nearby planning records within 5 km where a location match is available.

Matched source
F24A/1004E
Project type
One-off house
Coverage
5 km radius
1,661Nearby applications
18%Refused
1,362Conditional grants
7Refusal reasons

Top refusal reasons nearby

Design2
Premature Services1
Protected Structure1
Traffic Sightlines1
Visual Amenity1

Nearest similar decisions

F24A/1004E

We McHale Plant Hire Limited intend to apply for Planning Permission for the inclusion of a new foul sewer rising main and portion of gravity foul sewer plus associated decommissioning and removal of an existing on-site wastewater treatment plant at Staffordstown Business Park, Turvey, Donabate, Co. Dublin. The proposed foul sewer rising main will serve the Business Park by forming connection with an existing pump station on site with this rising main routed out of the Business Park down Turvey Avenue public road to the east, 2.5km approx. to a new discharge manhole connected to a proposed gravity foul sewer (ca. 585m long) to subsequently form connection with the existing Uisce Eireann foul sewer on Turvey Avenue adjacent to Turvey Woods Residential Development. The placement of this rising main will result in the decommissioning and removal of the existing treatment plant and associated percolation area in the Business Park.

Granted0.0 km14 January 2025
F25A/0461E

The development will consist of a prefabricated lightweight metal frame single-storey workshop building (600sq.m) along with rainwater harvesting.

Granted0.6 km16 July 2025
F21B/0030

Retention of changes to approved permission F07B/0430 plus the addition of 1 front (south) facing 1.1 m sq skylight, 4 no. rear (north) facing 1.1 m sq skylights and a rear (north) facing dormer to facilitate attic toilet/shower room 8.6 sqm with new stairs for access.

Granted0.6 km01 April 2021
F24A/0295E

1) Alterations and Single Storey Extension to side of existing Industrial Unit by 91sqm, 6450mm High at High Point and 5852mm at Eaves Level, together with All Ancillary Works.

Granted0.7 km22 May 2024
F21A/0062

Permission for a small-scale Waste Electrical and Electronic Equipment (WEEE) and Battery Storage and Transfer Facility, The applicant intends on accepting WEEE and Battery waste from permitted operators at this facility for temporary storage in UN approved containers prior to onward dispatch to authorised WEEE and Battery waste treatment facilities. The applicant intends on accepting a maximum of 520 tonnes of WEEE and Battery waste on-site per annum. A maximum of 20 tonnes of WEEE/Battery will be stored on-site at any one point in time. No on-site processing or treatment of WEEE/Battery waste will be undertaken at this facility. A Waste Facility Permit is required for the proposed activity under Classes 1 and 9 of Part 1 of the Third Schedule of the Waste Management (Facility Permit & Registration) Regulations 2007, as amended. The applicant intends on obtaining such a Waste Facility Permit. AI received 27/07/21

Granted0.9 km19 August 2021
F19A/0011

First floor office space at an existing warehouse unit.

Granted0.9 km04 March 2019

The full report covers all 1,661 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required