Demolition of remnants of existing single-storey rear extension and outbuildings, repairs to existing front porch, construction of part single-storey, part two-storey rear extension, and all associated groundworks and landscaping.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
51 St. Peter's Terrace, Howth, Dublin 13, D13 K882
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 1,084 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0001E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
(i) Partial demolition of existing single storey extension to side/rea
Works to include demolition of existing single storey extension to the
Permission is sought for alterations to a detached single storey garag
The retention of new vehicular access to the front of the dwelling. The retention of revisions to the vehicular entrance to the rear - off Balkill Grove. The retention of as built cottage and extension to the rear.
I. Construction of new single storey extension to rear of dwelling. II. Construction of new single storey courtyard infill extension to rear of dwelling. III. Retention of ground and first floor extension element to rear of dwelling. IV. Also to include all associated windows, landscaping, drainage and all associated works necessary to facilitate the development. AI received 22/11/21
The full report covers all 1,084 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0001EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report