The development will consist of reuse and interconnection of a derelict single-storey cottage and derelict two-storey cottage with the addition of a new part single-storey extension to match existing and demolition and rebuilding of a 9 sq.m. existing lean-to, all to create a new dwelling house. Also includes the refurbishment of an outbuilding to provide a study/workshop and a basement space with the uses being ancillary to the main house. Site works include general landscaping, provision of soak away, proprietary secondary wastewater treatment and percolation area and associated ancillary site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Belgee, Ring Commons, Co Dublin, (2nd Division)
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
25% of nearby decided applications were refused. The preview found 687 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0106
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the reuse and interconnection of a derelict single-storey cottage and derelict two-storey cottage with the addition of new single-storey extensions to the south of both buildings and demolition and rebuilding of a 9sqm existing lean-to to the north, all to create a new dwelling house. Also includes the refurbishment of an outbuilding to provide a study/workshop and a basement space with the uses being ancillary to the main house. Site works include general landscaping, provision of soak away, proprietary secondary wastewater treatment and percolation area and associated ancillary site works. Additional Information Received 29/01/2026 Clarification of Additional Information Received 15/04/2026
The re-use and interconnection with new extension of a derelict single storey cottage and two storey outbuilding to provide a one-storey, part two-storey, two-bedroom dwelling house. Adaption of single storey outbuilding to study/spare bedroom with en-suite, with use being ancillary to the main house. the demolition of lean-to structure (9 sq.m). Site works include general landscaping, provision of soakaway, proprietary secondary wastewater treatment system with tertiary polishing filter and all associated ancillary site works. AI received 8/4/2022
Planning permission for alterations to an existing house. To comprise the replacement of windows, the enlargement of existing dormers, the demolition and re-construction of an existing side extension to include additional area to rear and new hipped roof with a dormer, the demolition and relocation of an existing garden wall and all associated site works.
Permission for the construction of new detached dormer style dwelling,
Retention Permission is sought for: (i) Erection of 18 no. polytunnels (total area= 5,830sq.m); (ii) Change of use of 2 no. agricultural buildings to provide farm shop and cafe; and, (iii) Provision of ancillary food preparation unit contained within 1 no. container unit (14 sq.m). Permission is sought for: (i) Demolition of the existing unauthorised roofed area between the farm shop and café and construction of an extension to the farm shop (30sq.m)within this area; (ii) Construction of a single-storey timber structure (open-air) which will provide a covered entrance to the café and farm shop; (iii) Provision of demarcated vehicular parking area (7no.spaces); (iv) Provision of hedging to separate the farm shop and the existing residential dwelling; (v) Reopening and dedicated use of the northern vehicular entrance via Rowans Big laneway to provide public access to the farm shop, café and wider farm; (vi) Dedicated use of the existing southern vehicular entrance via Rowans Big laneway to provide private access to the residential dwelling only; (vii) all ancillary associated siteworks including hard and soft landscaping, boundary treatments, lighting, provision of planter boxes and external toilets, necessary to facilitate the development. Additional Information received 22/09/2025 Significant Additional Information received 09/10/2025 Clarification of Significant Additional Information received 26/11/2025 Further Significant Additional information received 05/12/25
The full report covers all 687 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0106The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report